resident homes along the S Park Street / S Oak Street corridor, Pecos, TX 79772 (own-home)
Repair a leaking swamp-cooler float valve.
The survey above found this home's swamp cooler float valve running past full, wasting scarce Pecos municipal water down the overflow line Read all of it
Not funded yet. Settles as earned credit, $100 proposed.
Proof it takes, the deadline, the level
- Proofhomeowner/resident-permission record + before/after photos + leak-stop confirm + GPS
- Open until2026-10-30
- Leveladvanced
All of it: the words, the place, the proof
The survey above found this home's swamp cooler float valve running past full, wasting scarce Pecos municipal water down the overflow line every hot Permian Basin afternoon.
Fund it for $100. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Record the resident's written or recorded permission before starting work.
- Photograph the swamp cooler's float valve running past full and overflowing down the overflow line, as found.
- Power off the cooler unit at its disconnect before opening the unit housing.
- Open the unit housing and check the float valve and float arm for the cause of the overflow.
- Install a new float valve, or adjust the float arm, so the water shuts off at the correct fill level.
- Photograph the new float valve or the adjusted float arm.
- Restore power to the unit and run it to confirm the water shuts off at the correct fill level with no overflow.
- Photograph or record video of the unit running with the water holding at the correct level and no overflow.
- Record the resident's permission, the before photo, the valve/arm photo, the after confirmation, and the home's GPS location as the proof package.
What counts as done
- Written or recorded permission from the resident
- Before photo/video of the overflowing float valve
- New float valve or float-arm adjustment photo
- After photo/video confirming the water shuts off at the correct fill level with no overflow
Proof is measured against these, not judged by taste.
The standard this serves
Water Efficiency. Water efficiency is the quiet discipline of wasting nothing indoors. The EPA's WaterSense program sets the marks: how many gallons a minute a faucet should pass, how to find the leak that runs a toilet all night, how a household's water bill tells a story. Mastery looks like an auditor who can walk a home in an hour and find every hidden gallon. The skill is built one fixture at a time, which is exactly what this packet asks: measure one flow, find one leak, record one truth about where the water goes.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1790808343009_ims2koy","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1790808343009_ims2koy