Expired
a public rain garden with newly established plantings, adjacent to a street-sweeper route, Cibolo, TX 78108 (Guadalupe County); best-estimate location near the town center, exact address not confirmed
Relocate curb-swept leaf litter to mulch a newly planted public rain garden, Cibolo, TX.
The street sweeper's route past this rain garden stages leaf litter at the curb and gutter apron ahead of each pass, bound Read all of it
Lapsed. Nothing is owed and nothing is waiting.
It is kept here so the link never dies. See work that is open now.
All of it: the words, the place, the proof
The street sweeper's route past this rain garden stages leaf litter at the curb and gutter apron ahead of each pass, bound for the sweeper truck's hopper and the transfer station, while the rain garden's new plantings ten feet away have no mulch layer to hold moisture or hold back weeds while they establish. Catching a load of that curb-staged litter before the truck does and spreading it in the rain garden instead turns a sweeper-truck load into the mulch layer the new planting needs.
This one lapsed at $85. Similar work is open on the board.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Confirm with the public-works or parks crew that the leaf litter is already swept and staged at the curb ahead of the sweeper truck -- this task starts from that staged material, it does not sweep or clear the curb itself -- and check it for trash, glass, or roadway debris; reject any load that fails.
- 2. Photograph the staged curb litter and the bare, unmulched soil around the new rain-garden plantings.
- 3. Hand-carry the litter to the rain garden and spread it as a 2-3 inch layer around the new plantings, pulled back from each stem.
- 4. Confirm the layer does not block the rain garden's inlet or overflow point.
- 5. Photograph the finished, mulched rain garden from the matching before vantage.
What counts as done
- Before photo of the leaf litter staged at the curb ahead of the sweeper truck
- Before photo of the bare, unmulched soil around the new rain-garden plantings
- After photo of the rain garden mulched 2-3 inches deep, inlet and overflow point left clear
- Site record: the exact site's name and street address, and the contact who agreed to the work
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Packet WORK_1790848002619_dpegrtk