public sidewalks of Slauson Avenue at the A Line Slauson station, Los Angeles and Huntington Park, CA

Clear the debris out of the curb and gutter line on Slauson Avenue between Long Beach Avenue and Pacific Boulevard, and Randolph Street along the rail right-of-way, Los Angeles, from the curb side.

Rake and sweep the silt, leaves and trash out of the gutter line, down to the flow line. Read all of it

Not funded yet. Settles as earned credit, $620 proposed.

Proof it takes, the deadline, the level
  • Proofbefore, after photos per stretch at fixed points + bags weighed or counted + grates photographed in place, never lifted + any full basin filed with a reference number + request or work order number cited
  • Open until2026-11-19
  • Levelentry
All of it: the words, the place, the proof

Rake and sweep the silt, leaves and trash out of the gutter line, down to the flow line. A gutter blocked with silt and trash floods the crosswalk in the first rain and sends everything in it to the storm drain, then the ocean. On Slauson Avenue between Long Beach Avenue and Pacific Boulevard, and Randolph Street along the rail right-of-way, Los Angeles, work from the curb behind cones, never in the traffic lane, with a trained flagger or the City's approved traffic control plan wherever a cone or a person would stand in a parking, bike or travel lane: rake the debris out of the gutter, bag it, and leave every grate and lid in place. Rake only the surface of an inlet grate, and never lift a grate or lid or reach into a drain, a vault or a basin. Weigh or count the bags and photograph each stretch before and after at the same points. File a basin full to the grate on MyLA311, the City of Los Angeles service request line, and the City of Huntington Park's public works line with the reference number. For the payer: - Price: $620 per block face of about 600 feet of gutter line, both sides of one block. Basis: two workers for about six hours at about $45 an hour each plus bags and disposal, with a trained flagger added where the City's plan needs one; proposed, to verify against the payer's unit price. - Likely payer: LA Sanitation and Environment (Clean Corridors and the storm drain program). In their words: data-driven street condition/cleanup operations. - No license is needed. - No permit is needed for hand clearing from the curb.

Fund it for $620. The receipt lands onchain once the proof is approved.

What it looks like
Behind a row of cones, a worker in a hi-vis vest rakes silt and leaves out of a curb gutter into a wheelbarrow while a spotter watches traffic; the gutter line runs clear to the flow line.

A description of this kind of work, not a record that it happened here.

Where
public sidewalks of Slauson Avenue at the A Line Slauson station, Los Angeles and Huntington Park, CA. Open the map
Pay
$620 proposed

This job is not funded yet, so this figure is a proposed price, not money held for the worker. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
before, after photos per stretch at fixed points + bags weighed or counted + grates photographed in place, never lifted + any full basin filed with a reference number + request or work order number cited

This is exactly what gets it approved. Nothing settles without it.

Level
entry: anyone can start here
Open until
2026-11-19
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • rake, flat shovel, broom and a wheelbarrow
  • contractor bags and a scale or a bag counter
  • cones, a sign and hi-vis vests
  • gloves, closed boots and eye protection
  • camera and GPS phone

Steps

  1. Photograph the gutter line wide from both ends and fix the points you will shoot from again.
  2. Set cones along the curb on the walk side and work only from the curb. Do not start if a cone or a person would stand in a parking, bike or travel lane unless a trained flagger (Title 8 section 1599) or the City's approved traffic control plan is in place.
  3. Rake and shovel the debris along the gutter line down to the flow line, working from the curb and never stepping into the traffic lane.
  4. Rake the surface of each inlet grate clear; never lift a grate or a lid, and never reach into a drain, a vault or a basin.
  5. Bag the debris, and stop at any needle or unknown container: do not touch it, photograph it, mark the spot and report it on MyLA311.
  6. Stop at belongings, a tent or bedding: do not touch or move them, never ask a person to move, and report them on MyLA311.
  7. Weigh or count the bags and record where they went.
  8. Photograph each stretch after from the same points, and file any basin full to the grate on MyLA311.

What counts as done

  • Before and after photos of each stretch from the same points, each with GPS and time
  • The bags weighed or counted, with where the debris went
  • Each inlet grate photographed in place after the work
  • Any basin full to the grate, needle or belongings spot filed on MyLA311, with the reference number
  • The MyLA311 service request number or the City work order this block answers, copied from the request, or none when there is none

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1792510592498_ytd2xa5","funderWallet":"0xYOU"}.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.