a corner taqueria at 620 W Manchester Ave, Los Angeles, CA 90003
Build a raised garden bed behind the taqueria, a corner taqueria.
A builder frames a raised bed with untreated lumber at a corner taqueria at 620 W Manchester Ave, fills it with soil and compost, and sets a level across the top, turning bare ground into a bed. Read all of it
Not funded yet. Settles as earned credit, $420 proposed.
Proof it takes, the deadline, the level
- Proofbefore/after photos + frame level check + soil-fill depth log + drainage confirm + GPS
- Open until2026-12-10
- Levelintermediate
All of it: the words, the place, the proof
Set up a framed, filled raised garden bed at the taqueria at 620 W Manchester Ave in Los Angeles. The audit is expected to find no local sourcing lane for herbs and greens and nowhere to grow them, and out back is the ground-up first step. For the payer: - Price: $420 per job, counted in raised beds built. - Likely payer: A grant-funded nonprofit crew (LA Conservation Corps, LANI, Clean California or CAL FIRE grants), or the site's host. - Public money rule: if a public agency pays for this job, California treats it as public works (Labor Code 1720). On public works over $1,000 every worker is paid at least the state prevailing wage for the craft (Labor Code 1771) and the contractor keeps certified payroll (Labor Code 1776); on a project over $25,000 the contractor must be registered with the Department of Industrial Relations (Labor Code 1725.5). The crew works under the payer's contractor of record. - No license is needed while the whole job, labor and materials together, stays under $1,000 (Business and Professions Code section 7048); at $1,000 or more, a CSLB C-27 Landscaping license, with C-5 Framing and Rough Carpentry for a built bed frame.
Offer to pay $420. The receipt lands onchain once the proof is approved.
Safety, read before you claim
Start after the crew's safety orientation. Get the owner's and manager's written consent first, never dig before an honored 811 locate, and use only untreated lumber and labeled fill soil, never site soil. Wear safety-toe boots, eye protection and leather gloves, team-lift soil and lumber, and keep water and shade close in the heat. Stop outdoor work when the AQI passes 150.
The full safety list for this job:
- Use only untreated, food-safe lumber, reject visibly contaminated fill soil, never dig post holes before calling 811, and get the owner or manager's consent first.
- Use no pallets, railroad ties or treated wood, and use fill soil that comes with a supplier's test or label; reject anything oily, smelly or full of trash. Wear closed-toe boots, cut lumber on a stable bench with the blade guard on, and team-lift the soil and lumber, because a 4 by 8 foot bed takes over a ton. Keep drinking water and shade within reach in the heat. Site the bed where it gets six hours of sun, keep a clear 36 inch path to it, and stay off septic lines, gas meters and the property line. Build 4 feet wide at most so a person can reach the middle, and 8 feet long at most. Use untreated redwood, cedar or Douglas fir 2 by 10 or 2 by 12 with exterior screws and a 4 by 4 post inside each corner. Staple 1/2 inch hardware cloth under the frame where gophers live. Ask the soil or compost supplier for a lab report or a testing seal and whether the compost was tested for persistent herbicide. Fill in lifts and settle with water; mix roughly one third finished compost to two thirds topsoil by volume, never straight compost. On asphalt or concrete the bed needs drainage holes and a barrier.
- Site briefing and who holds the 811 ticket (Title 8 section 3203).
- A quart of water an hour, shade at 80 degrees F and above, watch each other at 95 and above; hauling soil in July is hard work in heat (Title 8 section 3395).
- Check the air quality index (AQI) for wildfire smoke; at 151 or more the employer provides an N95 (Title 8 section 5141.1).
- Eye protection for every saw and drill job, guards on, GFCI or cordless on any outdoor circuit, and hearing protection for a circular saw (Title 8 section 3382).
- Use a wheelbarrow or cart, fill in lifts, and team-lift lumber; share the shoveling (Title 8 section 3203).
- Call 811 before a post hole, wait the two working days, and hand-dig within 24 inches of any mark (Title 8 section 1541).
- Wet the soil and compost before pouring, and use a fit-tested respirator under the employer's respiratory protection program, with a medical evaluation first, for cutting redwood or cedar and for pouring dry soil or compost; stop if dust still rises, because a dust mask is not protection (Title 8 section 5144).
- Gear, Title 8 sections 3385 and 3384: safety-toe boots for falling lumber and nails underfoot; leather gloves for splinters and nails.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- eye protection
- ear plugs
- a fit-tested respirator under the employer's program (Title 8 section 5144; an N95 is voluntary use with the Appendix D notice)
- work gloves
- closed-toe boots
- tape measure and carpenter's square
- level
- cordless drill and driver, hand saw or circular saw
- exterior screws
- 1/2 inch hardware cloth and a staple gun or snips
- wheelbarrow or garden cart
- shovel
- hat, sunscreen and a quart of water an hour
Steps
- Obtain the garden steward's or site host's written scope for this bed build before work (the beds to build, the date, and who owns and waters them) and, if a crew or grantee sent you, its work order. Get the site host's or agency's written consent to work there too. Write what you got at the top of your proof. With no written scope, stop.
- Get the owner's or manager's consent in writing, from both owner and tenant or manager, to build at the place this job's title names. Site each bed for six hours of sun, clear of meters, hydrants, the alley and the property line, with a 36 inch path to it and water within reach.
- Take a before photo of the bare ground at the agreed spot and record the GPS position there.
- Frame each bed with untreated redwood, cedar or Douglas fir, 2 by 10 or 2 by 12, exterior screws and corner posts, no wider than 4 feet. Lay 1/2 inch hardware cloth under it where gophers live. Use no pallets (check for a heat-treated stamp), railroad ties or treated wood.
- Fill each bed with raised-bed mix that has the supplier's label or test, about one third finished compost, filled in lifts and settled with water. Aim for 12 inches of fill (8 inches is the floor for herbs and greens only) and write down the fill depth. Do not use soil from the site or free construction fill.
- Soak each bed fully with water, wait 30 minutes, and check whether any water is standing; write down the result. If water stands, open drainage holes or check the barrier before leaving.
- Level the frame before it is filled, then lay a level across each framed, filled bed and check it again.
- Take an after photo of the framed, filled bed with the level on it, one photo per bed.
- Enter the before photo, the after photo, the fill depth log with the amendment or compost note, the drainage result and the GPS position into the proof record.
What counts as done
- Before photo of the bare/unused ground
- After photo of the framed, filled bed on a level check
- Soil-fill depth log (minimum 8 inches) + amendment/compost note
- Drainage confirmed (water test: no standing water 30 min after a full soak)
- The soil supplier's receipt or label.
- The fill depth, with a ruler in the soil.
- The drainage result, with a timestamp.
- Photos show no treated or painted wood, no pallet stamps, no bed too wide to reach across, no bed on bare concrete with no drainage and no soil that looks like site fill.
- Scope: the garden steward's or site host's written scope for this bed build, and the work order of any crew or grantee that sent you, dated before the first photo.
- Site consent: the site host's or agency's written consent to work there, dated before the first photo.
- Sign-off: the site host or steward, or the supervisor of the crew of record, signs off the finished work in writing. Write who signed and the date, or the date you asked.
- Photos: take the before photo and the after photo from the same point (stand where the first one was taken and match its frame), each with its GPS point and its date and time.
- Care, agreed before you plant: write who waters this planting and for how long (the payer's establishment period; three years is the usual ask), and who replaces a plant that dies. With no named steward, do not plant.
Proof is measured against these, not judged by taste.
The standard this serves
Edible Garden Cultivation. Edible garden cultivation is food growing done to the standards the land-grant universities have refined for a century: healthy soil in tested beds, the right crop in the right season, hand tools, patience, and records. Mastery looks like a Master Gardener's plot, beds that feed a family most of the year from a piece of ground the size of a parking space. Every gardener who reaches that point started with a single bed and a single season. This packet is that start: one bed built or tended properly, one honest note about what happened.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1794290787471_6w63bz7