a corner soul-food restaurant on the Market St corridor, Inglewood, CA 90301
Install a rain chain and basin.
A worker on a ladder, with a spotter present, anchors a rain chain at the gutter outlet at a corner soul-food restaurant on the Market St corridor, so runoff now follows the chain into a planted basin. Read all of it
Not funded yet. Settles as earned credit, $380 proposed.
Proof it takes, the deadline, the level
- Proofbefore/after photos + chain-to-gutter anchor photo + basin grading/overflow log + first-rain flow test + GPS
- Open until2026-12-10
- Levelintermediate
All of it: the words, the place, the proof
Install a rain chain from the downspout to a planted basin at a corner soul-food restaurant on the Market St corridor, Inglewood, CA. The audit is expected to flag the restaurant's bare downspout dumping every roof-runoff drop straight into the alley with real reuse potential untapped, and replacing that closed section slows and directs the flow to the back courtyard planting instead of losing it to the storm drain.
Offer to pay $380. The receipt lands onchain once the proof is approved.
Safety, read before you claim
After the crew's safety orientation, ladder safety at the gutter outlet (spotter required); keep the basin at least 10 feet from the building foundation; never route flow toward a neighboring property. Business-owner consent precedes work; employer provides water, shade and rests; wear boots and gloves.
The full safety list for this job:
- Gear, Title 8 sections 3385 and 3384: safety-toe boots for a filled barrel or cistern, which is heavy and can tip or drop; leather gloves for pinch points and rough fittings.
- Wildfire smoke, section 5141.1: at a PM2.5 AQI of 151 or more the employer provides N95 respirators for voluntary use and moves the work indoors or cuts exposure where feasible; above AQI 500 respirators are required under a respiratory protection program.
- Heat, section 3395: drinking water, shade and cool-down rests; shade is ready at 80 F and the high-heat steps start at 95 F.
- Orientation, section 3203: the crew's injury and illness prevention program orientation comes before any work.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Get the business owner's consent before starting work at the downspout.
- Photograph the bare downspout draining to the alley as the before photo.
- Set up a ladder safely at the gutter outlet with a spotter present.
- Anchor the rain chain securely at the gutter outlet.
- Position the planted basin at least 10 feet from the building foundation.
- Grade the basin so it drains within 24 to 48 hours and route its overflow away from the foundation.
- Photograph the rain chain anchored at the gutter outlet and log the basin's grading and overflow routing.
- Run a first-rain or hose-simulated flow test and record video of water tracking the chain into the basin with no splash-out.
- Photograph the installed setup and record the GPS location to complete the proof set.
What counts as done
- Before photo of the bare downspout draining to the alley
- Anchor photo showing the rain chain properly secured at the gutter outlet
- Basin grading and overflow-path log (basin drains within 24-48 hours, overflow routed away from the foundation)
- First-rain (or hose-simulated) flow-test video showing water tracking the chain into the basin with no splash-out
Proof is measured against these, not judged by taste.
The standard this serves
Water Efficiency. Water efficiency is the quiet discipline of wasting nothing indoors. The EPA's WaterSense program sets the marks: how many gallons a minute a faucet should pass, how to find the leak that runs a toilet all night, how a household's water bill tells a story. Mastery looks like an auditor who can walk a home in an hour and find every hidden gallon. The skill is built one fixture at a time, which is exactly what this packet asks: measure one flow, find one leak, record one truth about where the water goes.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1794291232646_vciw2df