← Board

Barnsdall Art Park, 4800 Hollywood Blvd, Los Angeles, CA 90027

Install erosion-control matting on the bare hillside slope, Barnsdall Art Park, 4800 Hollywood Blvd, Los Angeles, CA 90027.

A worker pins erosion-control matting down the bare, rain-cut hillside slope at Barnsdall Art Park, working top-down with overlapping panels to hold the soil while new plants take root. Read all of it

Not funded yet. Settles as earned credit, $380 proposed.

Proof it takes, the deadline, the level
  • Proofbefore/after photos + matting-pin/overlap check + slope-stability observation + GPS
  • Open until2026-12-10
  • Levelintermediate
All of it: the words, the place, the proof

Install pinned erosion-control matting over the bare, rain-cut hillside slope at Barnsdall Art Park, 4800 Hollywood Blvd, Los Angeles, CA 90027. The hazard survey is expected to find it below the hilltop paths, shedding sediment onto the walkway after every storm and slowly losing ground cover. Laid over graded ground, it holds the soil in place while new plantings establish roots.

Offer to pay $380. The receipt lands onchain once the proof is approved.

What it looks like
A worker pins erosion-control matting down the bare, rain-cut hillside slope at Barnsdall Art Park, working top-down with overlapping panels to hold the soil while new plants take root.

A description of this kind of work, not a record that it happened here.

Where
Barnsdall Art Park, 4800 Hollywood Blvd, Los Angeles, CA 90027. Open the map
Pay
$380 proposed

This job is not funded yet, so this figure is a proposed price, not money held for the worker. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
before/after photos + matting-pin/overlap check + slope-stability observation + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-12-10
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

A worker who can keep stable footing can do this; never work a slope steeper than a safe walking grade without the park operator's fall-restraint coordination. Work top-down, never undercut the slope, and always keep the adjacent path open on one side.

The full safety list for this job:

  • Hazards here: a steep slope, loose soil underfoot, stakes and mallet swings. Wear boots with grip and gloves, work top-down and go with a partner. Stop work and leave the slope if your footing gives way or rain starts, and never work below another person. Some experience of this kind of work helps; this job asks for no license or certificate.
How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Photograph the bare, rain-cut slope as found.
  2. Smooth the bare ground by hand so the matting can lie flat against the soil.
  3. Start at the top of the slope and unroll the first matting panel down the slope.
  4. Pin the panel to the soil in an even pattern across its whole width.
  5. Unroll each next panel so its edge overlaps the one beside it, and pin through the overlap.
  6. Keep laying and pinning panels until the whole bare slope is covered.
  7. Photograph the pins and panel overlaps up close so the pin pattern and the overlap show.
  8. Walk the covered slope, check for loose matting edges or exposed soil gaps, pin down any you find, and write down what you observed.
  9. Photograph the fully covered slope, save a GPS waypoint, and enter the before photo, pin pattern photo, after photo, slope-stability observation and waypoint in the proof record.

What counts as done

  • Before photo of the bare, rain-cut slope
  • Matting pin/staple pattern photo confirming secure anchoring and correct panel overlap
  • After photo of the fully covered slope
  • Slope-stability observation noting no loose matting edges or exposed soil gaps

Proof is measured against these, not judged by taste.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1794291455979_3mtwnu8