← Board

Lincoln Park Lake, Lincoln Heights, Los Angeles, CA 90031

Install a floating trash boom across the lake's inflow channel, Lincoln Park Lake, Lincoln Heights, Los Angeles, CA 90031.

A worker anchors a floating trash boom bank to bank across the lake's inflow channel at Lincoln Park Lake, working only from the banks, so drifting litter is trapped before it reaches the lake. Read all of it

Not funded yet. Settles as earned credit, $540 proposed.

Proof it takes, the deadline, the level
  • Proofbefore/after photos + anchor-point security check + boom-tension log + service-schedule log + GPS
  • Open until2027-02-09
  • Levelintermediate
All of it: the words, the place, the proof

Install a floating containment boom across the lake's storm-drain inflow channel at Lincoln Park Lake, Lincoln Heights, Los Angeles, CA 90031. The channel carries urban litter straight into the water with no interception. Anchored bank-to-bank, it traps that load before the lake is fouled, and no device goes into the drain itself. Start after the crew's safety orientation. For the payer: - Price: $540 per job, counted in booms installed. - Likely payer: Measure W, the Safe Clean Water Program, through the project owner. - License: the CSLB class that matches the boom and its anchors (A General Engineering for work in the channel, C-13 Fencing for the anchor posts).

Offer to pay $540. The receipt lands onchain once the proof is approved.

What it looks like
A worker anchors a floating trash boom bank to bank across the lake's inflow channel at Lincoln Park Lake, working only from the banks, so drifting litter is trapped before it reaches the lake.

A description of this kind of work, not a record that it happened here.

Where
Lincoln Park Lake, Lincoln Heights, Los Angeles, CA 90031. Open the map
Pay
$540 proposed

This job is not funded yet, so this figure is a proposed price, not money held for the worker. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
before/after photos + anchor-point security check + boom-tension log + service-schedule log + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2027-02-09
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

Only a worker who has coordinated access and timing with LA Recreation and Parks and the city stormwater program may install it. Work from the banks only; never enter the water or wade into the channel to set anchors; never handle sharps by hand.

The full safety list for this job:

  • Gear, Title 8 sections 3385 and 3384: waterproof non-slip boots for slick banks, an abnormally wet location; cut-resistant waterproof gloves for glass, sharps and contaminated water.
  • Wildfire smoke, section 5141.1: at a PM2.5 AQI of 151 or more the employer provides N95 respirators for voluntary use and moves the work indoors or cuts exposure where feasible; above AQI 500 respirators are required under a respiratory protection program.
  • Heat, section 3395: drinking water, shade and cool-down rests; shade is ready at 80 F and the high-heat steps start at 95 F.
  • Orientation, section 3203: the crew's injury and illness prevention program orientation comes before any work.
How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Obtain the project owner's signed scope or work order that names this site and its plan, and the owner's or agency's written consent, before any digging or lifting. For a Safe Clean Water Program project, add the project's name. Write both at the top of your proof. With no signed scope, stop.
  2. Coordinate installation timing and access with the named parks and stormwater contacts.
  3. Photograph the unfiltered inflow channel before installation.
  4. Set the boom anchors from the two banks without entering the channel.
  5. Check anchor security at both banks and record the boom tension and no-gap span.
  6. Photograph the installed boom and record the service and inspection schedule.
  7. Save GPS for the completed installation.

What counts as done

  • Before photo of the unfiltered inflow channel
  • Anchor-point security check at both banks (boom cannot be pulled loose by normal flow)
  • Boom-tension log confirming the boom spans the channel with no gap for debris to pass under or around
  • After photo of the installed boom + service/inspection schedule logged for future debris removal
  • Scope: the project owner's signed scope or work order that names this site and its plan (and the Safe Clean Water Program project name, if there is one), dated before the first photo.
  • Consent: the owner's or agency's written consent for this site, dated before the first photo.
  • Sign-off: the project owner signs off the finished work in writing. Write who signed and the date, or the date you asked.
  • Photos: take the before photo and the after photo from the same point (stand where the first one was taken and match its frame), each with its GPS point and its date and time.
  • Count: booms installed, written next to the photos.
  • Capture: write the drainage area in square feet that the device serves and the device's rated capacity from its label, taking the area from the project owner's scope.
  • Design basis: the feasibility study or design plan this site follows, named in the project owner's scope and written at the top of your proof.
  • After the first real rain, photograph the same two points and write what the water did: where it ponded, where it ran and what it carried.

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1794292381175_65oibik