the 8300-9000 block of S Vermont Ave, curb medians + parking-lot edges, Los Angeles, CA 90044

Curb-median + parking-lot-edge stormwater function inspection -- the 8300-9000 block of S Vermont Ave, curb medians + parking-lot edges, Los Angeles, CA 90044.

An inspector pushes a probe into curb median soil at the 8300-9000 block of S Vermont Ave, checking how it drains, then stretches a measuring tape along the strip to size a candidate swale. Read all of it

Not funded yet. Settles as earned credit, $280 proposed.

Proof it takes, the deadline, the level
  • Proofphoto per site + GPS + drainage-path/slope condition + candidate-swale sizing
  • Open until2026-12-25
  • Levelintermediate
All of it: the words, the place, the proof

Inspect the curb medians and parking-lot edges along the 8300-9000 block of S Vermont Ave, Los Angeles for bioswale sites. They shed runoff straight to the street with no infiltration, and nobody has inspected which sites could host a bioswale that actually captures that flow.

Offer to pay $280. The receipt lands onchain once the proof is approved.

What it looks like
An inspector pushes a probe into curb median soil at the 8300-9000 block of S Vermont Ave, checking how it drains, then stretches a measuring tape along the strip to size a candidate swale.

A description of this kind of work, not a record that it happened here.

Where
the 8300-9000 block of S Vermont Ave, curb medians + parking-lot edges, Los Angeles, CA 90044. Open the map
Pay
$280 proposed

This job is not funded yet, so this figure is a proposed price, not money held for the worker. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
photo per site + GPS + drainage-path/slope condition + candidate-swale sizing

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-12-25
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

Needs someone who can follow the EPA green-infrastructure inspection method; this job asks for no licence. Document only and never dig or alter a structure; wear hi-vis and stay off the roadway near traffic.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • measuring tape
  • GPS phone
  • camera
  • trowel / probe
  • data sheet
  • gloves

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

What counts as done

  • Photo per candidate median/lot-edge site
  • GPS waypoint per site
  • Drainage-path, slope, and soil-infiltration observation
  • Candidate swale sizing naming the follow-on build job

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1794292958804_zwybwo8