← Board

Rattlesnake Park, 3624 Ripple St, Los Angeles, CA 90031

Curb + park-edge stormwater function inspection -- Rattlesnake Park, 3624 Ripple St, Los Angeles, CA 90031.

Inspect the park edge at Rattlesnake Park in Los Angeles, CA for where a bioswale could go. Read all of it

Not funded yet. Settles as earned credit, $280 proposed.

Proof it takes, the deadline, the level
  • Proofphoto per site + GPS + drainage-path/slope condition + candidate-swale sizing
  • Open until2026-12-25
  • Levelintermediate
All of it: the words, the place, the proof

Inspect the park edge at Rattlesnake Park in Los Angeles, CA for where a bioswale could go. It sheds runoff straight to the storm drain and toward the LA River with no infiltration during real storms, and nobody has checked which sites could capture that flow.

Offer to pay $280. The receipt lands onchain once the proof is approved.

What it looks like
An inspector probes the inlet and outlet of a rain garden at Rattlesnake Park, turning unchecked condition into a recorded pass or a flagged clog.

A description of this kind of work, not a record that it happened here.

Where
Rattlesnake Park, 3624 Ripple St, Los Angeles, CA 90031. Open the map
Pay
$280 proposed

This job is not funded yet, so this figure is a proposed price, not money held for the worker. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
photo per site + GPS + drainage-path/slope condition + candidate-swale sizing

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-12-25
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

Documentation only: never dig, and work from the sidewalk or park path, off the roadway, in hi-vis near traffic. This job asks for no licence or training.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • measuring tape
  • GPS phone
  • camera
  • trowel / probe
  • data sheet
  • gloves

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

What counts as done

  • Photo per candidate park-edge/curb site
  • GPS waypoint per site
  • Drainage-path, slope, and soil-infiltration observation
  • Candidate swale sizing naming the follow-on build job

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund

Packet WORK_1794293083435_zvjaxap