the Pacific Blvd corridor frontage, Huntington Park, CA 90255

Curb + frontage stormwater function inspection -- the Pacific Blvd corridor frontage, Huntington Park, CA 90255.

From the sidewalk at the Pacific Blvd corridor frontage, an inspector in hi-vis measures the curb frontage with a measuring tape, photographs the inlet, and records any sediment or trash blocking it. Read all of it

Not funded yet. Settles as earned credit, $280 proposed.

Proof it takes, the deadline, the level
  • Proofphoto per site + GPS + drainage-path/slope condition + candidate-feature sizing
  • Open until2026-12-25
  • Levelintermediate
All of it: the words, the place, the proof

Inspect the curb and frontage at the Pacific Blvd corridor frontage, Huntington Park, CA for where a bioswale could go. It sheds runoff straight to the storm drain with no infiltration during heavy rains, and nobody has checked which sites could host green stormwater infrastructure.

Offer to pay $280. The receipt lands onchain once the proof is approved.

What it looks like
From the sidewalk at the Pacific Blvd corridor frontage, an inspector in hi-vis measures the curb frontage with a measuring tape, photographs the inlet, and records any sediment or trash blocking it.

A description of this kind of work, not a record that it happened here.

Where
the Pacific Blvd corridor frontage, Huntington Park, CA 90255. Open the map
Pay
$280 proposed

This job is not funded yet, so this figure is a proposed price, not money held for the worker. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
photo per site + GPS + drainage-path/slope condition + candidate-feature sizing

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-12-25
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

This job asks for no licence; this is documentation only, done in hi-vis from the sidewalk. Do not dig, and stay off the roadway near traffic.

How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • measuring tape
  • GPS phone
  • camera
  • trowel / probe
  • data sheet
  • gloves

Steps

  1. 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
  2. 2. Photograph the asset, its inlet, and its outlet/overflow.
  3. 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
  4. 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
  5. 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
  6. 6. Note erosion, bypass, or structural damage and list the maintenance needed.
  7. 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.

What counts as done

  • Photo per candidate site
  • GPS waypoint per site
  • Drainage-path, slope, and soil-infiltration observation
  • Candidate feature sizing naming the follow-on build job

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.