Barnsdall Art Park, 4800 Hollywood Blvd, Los Angeles, CA 90027
Hilltop drainage function inspection -- Barnsdall Art Park, 4800 Hollywood Blvd, Los Angeles, CA 90027.
Inspect the park's hilltop paths and lawn at Barnsdall Art Park, 4800 Hollywood Blvd, Los Angeles, CA 90027 for a bioswale site. Read all of it
Not funded yet. Settles as earned credit, $280 proposed.
Proof it takes, the deadline, the level
- Proofphoto per site + GPS + drainage-path/slope condition + candidate-swale sizing
- Open until2026-12-25
- Levelintermediate
All of it: the words, the place, the proof
Inspect the park's hilltop paths and lawn at Barnsdall Art Park, 4800 Hollywood Blvd, Los Angeles, CA 90027 for a bioswale site. They shed runoff straight downslope with no infiltration during Los Angeles winter rains, and nobody has looked for a place that actually captures that flow before it reaches the slope.
Offer to pay $280. The receipt lands onchain once the proof is approved.
Safety, read before you claim
A worker able to probe soil and photograph an inlet can do this; no licence or supervision is asked for. Stay on stable ground near the slope edge, and never dig, because this is documentation only.
The full safety list for this job:
- Hazards here: traffic, standing water, slippery sediment and sun. Stay out of standing water, wear closed-toe shoes with grip and a bright top, and wash your hands after touching any inlet or debris. Stop work and move away if a vehicle enters your space or anyone confronts you. Some experience of this kind of work helps; this job asks for no license or certificate.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- measuring tape
- GPS phone
- camera
- trowel / probe
- data sheet
- gloves
Steps
- 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
- 2. Photograph the asset, its inlet, and its outlet/overflow.
- 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
- 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
- 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
- 6. Note erosion, bypass, or structural damage and list the maintenance needed.
- 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.
What counts as done
- Photo per candidate site
- GPS waypoint per site
- Drainage-path, slope, and soil-infiltration observation
- Candidate swale sizing naming the follow-on build job
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1794293222347_y3ebdjn