public streets, river greenway paths and city parks, Los Angeles, Los Angeles County, CA
Inventory the water fixtures.
Walk a public building in Los Angeles and record every water fixture's type, flow rate and drip. Read all of it
Not funded yet. Settles as earned credit, $80 proposed.
Proof it takes, the deadline, the level
- Prooffixture table with type, location, stamped flow rate + WaterSense label present or absent + drip status per fixture + a ranked retrofit list against WaterSense criteria
- Open until2027-11-13
- Levelentry
All of it: the words, the place, the proof
Walk a public building in Los Angeles and record every water fixture's type, flow rate and drip. A school or library pays for every gallon through fixtures left uncounted since the building opened. With the facility manager's written permission, record each fixture's location, whether it carries a WaterSense label, and its apparent age, reading flow from the stamp or the manufacturer's published spec, not from a guess. Rank what a retrofit would save using WaterSense criteria and the building's own use, and hand the list to the facility manager. This is documentation only; nothing is turned, opened or replaced.
Offer to pay $80. The receipt lands onchain once the proof is approved.
Safety, read before you claim
Nothing potable is touched: open no pipe, turn no fitting and add no chemical. Documentation only with the facility manager's written permission, accompanied by any escort the building requires: never turn a valve, open a fixture, remove an aerator or enter a mechanical space alone.
The full safety list for this job:
- This program does not test drinking water; any drinking water question routes to a certified laboratory and the local health department.
- An escort is carried where the building requires one.
- Any leak found is reported to the facility manager the same day.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- the facility manager's written permission and an escort where the building requires one
- GPS phone and camera with a timestamp
- clipboard or tablet with one row per fixture
- a flashlight for reading a stamped flow rate
- the manufacturer's published specification for any fixture with no legible stamp
- a watch or phone timer for the fixed night flow interval
Steps
- 1. Confirm written permission, the escort the building requires, and the rooms that are in scope, before entering any space.
- 2. Walk the building room by room and record every fixture: type, location, the flow rate stamped on it, whether it carries a WaterSense label, its apparent age, and whether it drips or runs on. Read flow from the stamp or the manufacturer's published specification, never from a guess.
- 3. Photograph every fixture found dripping or running, and report each one to the facility manager the same day rather than at the end of the packet.
- 4. Rank a retrofit against WaterSense flow criteria and the building's own use, labeling every saving figure an estimate, and hand the ranked list to the facility manager.
- 5. For a night flow reading, have the facility manager confirm in writing that fixtures and irrigation are off, then photograph the building's own meter with the reading and timestamp legible.
- 6. Wait a fixed interval, photograph the same meter again, and compute the flow in the meter's own units using the meter model and its multiplier.
- 7. Add the reading to the building's running log beside previous months so the building holds a trend rather than an anecdote, and hand any non zero reading to the facility manager the same day.
What counts as done
- The facility manager's written permission and the building named, with the date and time of the walk
- A fixture table: type, room or location, stamped or published flow rate with its units, WaterSense label present or absent, and apparent age
- Drip and run on status per fixture, with a photo of each fixture found dripping
- A ranked retrofit list against WaterSense flow criteria with the estimated annual saving per line, every estimate labeled an estimate, delivered to the facility manager
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1794601071847_k9gka3f