public streets, river greenway paths and city parks, Los Angeles, Los Angeles County, CA

Convert a strip of nonfunctional public turf to native planting.

Lift or smother one strip of nonfunctional turf on a public median in Los Angeles by hand. Read all of it

Not funded yet. Settles as earned credit, $320 proposed.

Proof it takes, the deadline, the level
  • Proofwritten permission + GPS polygon with square footage + before, after photos + species list with counts, spacing + written confirmation the zone is off
  • Open until2027-11-13
  • Levelintermediate
All of it: the words, the place, the proof

Lift or smother one strip of nonfunctional turf on a public median in Los Angeles by hand. Nonfunctional turf is grass nobody walks on, and watering it anyway, forever, is wasteful. Nevada wrote it into law and pays to remove it; most places have the same strips and no program. With the authority's written permission, on a named median, parking island or park edge, loosen the soil, plant regionally native low water species at spacing, mulch, and have the authority's own staff shut off the irrigation for that strip at the zone. Record the square footage and the strip's prior water use so the saving can be counted later. For the payer: - Price: $320 per job, counted in square feet of turf converted. - Likely payer: LADWP rebate programs, paid to the account holder after the program's pre-approval.

Offer to pay $320. The receipt lands onchain once the proof is approved.

What it looks like
A worker with a flat shovel lifts a strip of turf on a public median, loosens the soil, plants native species at spacing, and spreads mulch over the finished strip.

A description of this kind of work, not a record that it happened here.

Where
public streets, river greenway paths and city parks, Los Angeles, Los Angeles County, CA. Open the map
Pay
$320 proposed

This job is not funded yet, so this figure is a proposed price, not money held for the worker. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash: recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
written permission + GPS polygon with square footage + before, after photos + species list with counts, spacing + written confirmation the zone is off

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2027-11-13
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

Safety, read before you claim

Start after the crew's safety orientation. Nothing potable is touched: open no pipe, turn no fitting and add no chemical. Work public land with written permission and no license asked, hand tools only, an honored 811 locate first, no herbicide, and never shut a valve or alter irrigation hardware; wear sturdy closed-toe boots and leather-palm gloves; the employer provides drinking water, shade and cool-down rests, and N95 masks when wildfire smoke puts the AQI at 151 or more.

The full safety list for this job:

  • This program does not test drinking water; any drinking water question routes to a certified laboratory and the local health department.
  • No digging deeper than 12 inches, and never before an honored 811 locate on any strip with unknown utilities.
  • The authority's own staff shuts the zone off and confirms it in writing.
  • Hi-vis on any road shoulder; work from the sidewalk, park or right-of-way, never in a travel lane.
  • Gear, Title 8 sections 3385 and 3384: sturdy closed-toe boots for shovel and tool strikes on rough ground; leather-palm gloves for thorns, glass and soil contact.
  • Wildfire smoke, section 5141.1: at a PM2.5 AQI of 151 or more the employer provides N95 respirators for voluntary use and moves the work indoors or cuts exposure where feasible; above AQI 500 respirators are required under a respiratory protection program.
  • Heat, section 3395: drinking water, shade and cool-down rests; shade is ready at 80 F and the high-heat steps start at 95 F.
  • Orientation, section 3203: the crew's injury and illness prevention program orientation comes before any work.
How this work is done

How this work is done

A documented method, so this packet comes out the same whoever does it.

Bring

  • GPS phone, camera and a measuring wheel or tape
  • public aerial imagery and the agency's landscape plan where one exists
  • twelve months of reference evapotranspiration from the nearest public weather station
  • the site's own water use records or meter readings
  • the WaterSense labeled controller with its manual, and a rain or soil moisture sensor
  • hand tools, mulch and regionally native plants for the conversion rung, with an 811 locate before any digging

Steps

  1. 1. Get written permission from the owning authority, naming the site and the work, before any measurement, programming or planting.
  2. 2. Walk and map the site: irrigated area by landscape type, and for each zone the soil, the slope, the plant type and the head type, photographed as recorded.
  3. 3. Pull twelve months of reference evapotranspiration from the nearest public weather station, name the station and the network, and apply plant factors from a cited source rather than from memory.
  4. 4. Compute the budget volume and set it beside the site's recorded use, labeling where the use figure came from, then state the gap in both volume and percent and one plain sentence on what could explain it.
  5. 5. For a controller packet, save the existing schedule before changing anything, program the new schedule to the zone map, pair the rain or soil moisture sensor, and photograph the old and new schedules side by side. Work at the controller face and an existing outlet only: never open an electrical enclosure and never land a wire.
  6. 6. For a turf conversion, mark the strip, smother or hand lift the turf, loosen the soil, plant regionally native low water species at spacing, and mulch. Then obtain written confirmation from the authority that the zone serving the strip has been shut off or re-programmed by their own staff.
  7. 7. Record the square footage converted and the strip's prior water use, so the saving can be counted next season rather than claimed today.

What counts as done

  • The public authority's written permission naming the strip, with a GPS polygon and the square footage converted
  • Before and after photos from the same two vantage points, plus a photo of the mulched finished strip
  • Species list with counts and spacing, all regionally native and low water for the region, with the nursery or seed source
  • Written confirmation from the authority that the irrigation zone serving the strip has been shut off or re-programmed, naming who did it
  • Sign-off: the owner or manager signs off the finished work in writing, and LADWP's completion review accepts the record when a rebate pays for it. Write who signed and the date, or the date you asked.
  • Pre-approval first: the LADWP rebate program's pre-approval or reservation number and date, from before any work, or the words 'no rebate' when none is claimed.
  • Photos: take the before photo and the after photo from the same point (stand where the first one was taken and match its frame), each with its GPS point and its date and time.
  • Care, agreed before you plant: write who waters this planting and for how long (the payer's establishment period; three years is the usual ask), and who replaces a plant that dies. With no named steward, do not plant.
  • Five years: when a turf replacement rebate pays for the conversion, tell the owner in writing that the area must stay compliant with the program's rules for five years, and record that they were told.

Proof is measured against these, not judged by taste.

What is promised, and what is not

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.

Other acts: vote, pledge, fund