public streets, river greenway paths and city parks, Los Angeles, Los Angeles County, CA
Establish a native shade hedgerow along an open water edge.
Plant a row of regionally native shrubs set back from a public open water edge near Los Angeles. Read all of it
Not funded yet. Settles as earned credit, $330 proposed.
Proof it takes, the deadline, the level
- Proofwritten permission from the owning district + 811 ticket + GPS line with setback from the water line + before, after photos + species list with counts + first year watering plan with a named steward
- Open until2027-11-13
- Levelintermediate
All of it: the words, the place, the proof
Plant a row of regionally native shrubs set back from a public open water edge near Los Angeles. An open water edge left bare of shade loses water to evaporation, which is partly why Turlock's Project Nexus put solar canopies over irrigation canals, and a living hedgerow does the same thing at a smaller scale for the price of plants. On a district canal bank, a pond margin or a reservoir shore, with the owning district's or authority's written permission and an honored 811 locate, plant shrubs and small trees at the spacing the agency allows, staked and mulched, with a first year watering plan and a named steward. Where the place has no open conveyance, the same row goes on the public pond or reservoir edge it does have, and the packet says which. For the payer: - Price: $330 per job, counted in shrubs set along the water edge, by species. - Likely payer: A grant-funded nonprofit crew (LA Conservation Corps, LANI, Clean California or CAL FIRE grants), or the site's host.
Offer to pay $330. The receipt lands onchain once the proof is approved.
Safety, read before you claim
Start after the crew's safety orientation. Nothing potable is touched: open no pipe, turn no fitting and add no chemical. Work public ground with the district's written permission and no license asked, hand tools and an honored 811 locate, never enter the channel and never work during high flow; wear waterproof non-slip boots and cut-resistant waterproof gloves; the employer provides drinking water, shade and cool-down rests, and N95 masks when wildfire smoke puts the AQI at 151 or more.
The full safety list for this job:
- This program does not test drinking water; any drinking water question routes to a certified laboratory and the local health department.
- No digging deeper than 12 inches.
- Never on the water side of the maintenance road.
- No herbicide.
- Gear, Title 8 sections 3385 and 3384: waterproof non-slip boots for slick banks, an abnormally wet location; cut-resistant waterproof gloves for glass, sharps and contaminated water.
- Wildfire smoke, section 5141.1: at a PM2.5 AQI of 151 or more the employer provides N95 respirators for voluntary use and moves the work indoors or cuts exposure where feasible; above AQI 500 respirators are required under a respiratory protection program.
- Heat, section 3395: drinking water, shade and cool-down rests; shade is ready at 80 F and the high-heat steps start at 95 F.
- Orientation, section 3203: the crew's injury and illness prevention program orientation comes before any work.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- an evaporation pan or a marked float staff, set on public ground with permission
- a ruler or hook gauge readable to a tenth of an inch, and a fixed time of day for reading
- the agency's published evaporation rate for the nearest station or reservoir
- public aerial imagery for the surface area measurement
- the local daily rainfall record from a named public source
- hand tools, stakes, mulch and regionally native shrubs and small trees for the shade rung, with an 811 locate before any digging
Steps
- 1. Name the open water surface exactly: a canal reach with its district and mileposts, a reservoir with its operating agency, a pond with its park, or a public pool with its facility. Get written permission for anything placed on a bank.
- 2. Find the agency's published evaporation rate for the nearest station or for the reservoir itself, and record the agency, the period and the units.
- 3. Set the pan or the marked staff on public ground, record its GPS location, and read it at the SAME hour every day, writing the raw reading before any correction.
- 4. Subtract the day's rainfall from a named public source, keep the raw and corrected columns side by side, and never discard a reading that looks wrong; annotate it instead.
- 5. Measure the open water surface area from public imagery, record the imagery date and the method, and state the area as a measurement with its uncertainty rather than as a fact.
- 6. Compute the month's evaporation in gallons twice, once from the published rate and once from the direct series, print both, and state the difference plainly without explaining it away.
- 7. For a shade packet, confirm the district's written permission and the setback it requires, honor the 811 locate, plant the row set back from the water line at the agency's spacing, stake and mulch, and record the first year watering plan with a named steward and the water source that plan uses.
What counts as done
- The owning district's or authority's written permission naming the reach or edge, and the 811 locate ticket number, both dated before any digging
- A GPS line of the row with the setback from the water line in feet and the agency's stated setback requirement
- Before and after photos from the same vantage, species list with counts, all regionally native, and the nursery source
- The first year watering plan with the named steward who will carry it, and the water source that plan uses
- Sign-off: the site host or steward, or the supervisor of the crew of record, signs off the finished work in writing. Write who signed and the date, or the date you asked.
- Photos: take the before photo and the after photo from the same point (stand where the first one was taken and match its frame), each with its GPS point and its date and time.
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1794601092546_z3ynqo1