public sidewalks of Wilshire Boulevard at Westwood Boulevard and at the VA campus edge, Westwood, Los Angeles, CA
Log any pumped water running to the street around Metro D Line Extension Section 3, Westwood/UCLA and Westwood/VA Hospital stations, Los Angeles.
Log any pumped or draining water running from the D Line Westwood/UCLA build to the street or a storm inlet. Read all of it
Not funded yet. Settles as earned credit, $80 proposed.
Proof it takes, the deadline, the level
- Proofevery flow located, photographed with its look + time, GPS, where it runs noted + no-flow visits noted + stop-work lines routed to the site contact + flows filed with reference numbers + the log's anchor hash
- Open until2026-12-14
- Levelentry
All of it: the words, the place, the proof
Log any pumped or draining water running from the D Line Westwood/UCLA build to the street or a storm inlet. A build that digs below the water table pumps groundwater out of its dig, and that water can reach the gutters of Wilshire Boulevard between Glendon Avenue and Veteran Avenue, and Westwood Boulevard at the station head from a hose, a pipe or the gate while nobody has logged it. Document only, from the sidewalk: for each flow note where it starts and how far it runs, and photograph how it looks, clear, cloudy or carrying sediment, with a time and a GPS point. Take no sample and run no test. File what you saw on the city's stormwater reporting line and, for a discharge, with the regional water board, and record the reference numbers. This program publishes observations and their references and never declares a site compliant, safe, clean or in violation; that is the agency's call.
Offer to pay $80. The receipt lands onchain once the proof is approved.
Safety, read before you claim
Nothing inside the fence is done by a worker, ever: documentation stays on the sidewalk, parkway or road edge. Never touch the water, a hose or a pipe, and do not sample it; at water across the walkway, an open excavation edge or traffic, stop work, back away and tell the build's posted contact line. Wear hi-vis at any road edge; no special training is needed.
The full safety list for this job:
- Stop and file, never confront: water running across the walkway, a hose or pipe at the curb, an open excavation edge at the fence line, or a vehicle working at the curb. Photograph it from where you stand and write what you see, not what it means.
- Seen, not judged: how water looks says nothing about what is in it, and clear water is not clean water. The log says where the water runs and how it looks, and the regional water board decides whether a discharge is allowed.
- Traffic, Title 8 section 1598: wear a high-visibility vest, jacket or shirt (ANSI/ISEA 107) on any walk or curb edge next to moving traffic, and work from the sidewalk side.
- Wet footing: water across a walk is a slip hazard, so go around it on the public side in slip-resistant shoes, and never wade, step into a gutter flow or reach toward a hose, a pipe or an inlet.
- Permission: a public sidewalk needs no owner's permission, so if the only view of a flow is from private property, skip it.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- phone with a camera, GPS and a clock
- hi-vis vest for any curb edge next to moving traffic
- a note app or notebook for the visit log
- the city's stormwater reporting line and the build's posted contact line written down
- a hashing tool for the anchor step
Steps
- Walk the public edge of the build on two different days in the month, rain or no rain, from the sidewalk side only, and note the time each visit starts and ends.
- Look for water running from a hose, a pipe or the gate toward the street, the gutter or a storm inlet, and stay out of every lane, closure and flagger's zone.
- For each flow, photograph where it starts and how far it runs, wide and close, with a GPS point and the time, and write where it ends.
- Describe how the water looks as seen, clear, cloudy or carrying sediment, and take no sample, run no test and write nothing about what is in it.
- For a visit that finds no flow, photograph the same points with the time and write no flow seen.
- At water across the walkway, an open excavation edge or traffic at the curb, stop work: photograph it from where you stand, back away and tell the build's posted contact line.
- File each flow on the city's stormwater reporting line and, for a discharge, with the regional water board, tell the build's posted contact line, and record every reference number.
- Publish the log in full without any statement that the site is compliant or in violation, and anchor its content hash via vealth.net/anchor.
What counts as done
- At least two timed visits on different days in the month, each with its start and end time and the stretches of the public edge it walked
- Every flow of water from the build to the street or a storm inlet photographed wide and close with a GPS point and the time, showing where it starts and how far it runs, or the words no flow seen for that visit
- How each flow looks, described only as seen: clear, cloudy or carrying sediment, with the photo; no sample, no test and no word about what is in the water
- Anything seen filed on the city's stormwater reporting line and, for a discharge, with the regional water board, and told to the build's posted contact line, with every reference number recorded
- Any stop-work line met (water across the walkway, an open excavation edge, traffic at the curb) photographed from where you stood, with a note that you backed away and told the build's posted contact line
- The log published in full and its content hash anchored via vealth.net/anchor
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment, made by the payer straight to the worker, with no Vealth fee. Paying Vealth is closed: Vealth takes no new card or wallet payment for a job. To fund a job, offer to pay the worker directly, then pay them yourself when you accept the proof, from your own wallet or by your own card or bank. From a wallet: prepare_token_offer, sign, submit_token_offer; after the proof is accepted you pay the worker on chain and the worker records it (prepare_token_settlement, or POST /labor/settle for USDC on Base). By card or bank: prepare_direct_offer, sign, submit_direct_offer; you pay the worker yourself and the worker records it with prepare_direct_settlement. Both are free, need no gas, and move no money through Vealth.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1794617516224_4mhgwxj