Agent-ready demo · Concept mock · Independent · Not an Edison/SCE product

The same brush clearance: once as an internal record, once as a receipt a court can check.

Edison/SCE's own palette, tuned to WCAG AA. Two acts: the trust-us status quo, then the proof-verified clearance packet EcoWealth runs live today. Press the buttons: every step is real on our rail.

Concept mock. Not an Edison or SCE product or endpoint. Circuit names, spans, and IDs below are illustrative; the lifecycle, the hazard gate, the proof-checker, and the on-chain settlement are EcoWealth's live systems. Colors approximate the Edison/SCE brand for illustration only.
Act 1: today

"Was this span cleared to spec last cycle?"

After an ignition, an investigator asks. Today the answer is an internal record no third party can independently verify.

Investigator's AI agent
For circuit HFRA-118, span 42: was the vegetation clearance completed to the required radial clearance on the last cycle, and by whom?
Records today
Vegetation management is performed per the approved Wildfire Mitigation Plan. Specific completion records are available internally through work management; please submit a records request.
The record likely exists, internally. But nothing is independently verifiable, and the answer arrives through discovery, not proof. In a subrogation case, that gap is the whole fight.
Act 2: the proof-verified packet

The same clearance, run as an EWP work packet

It can't be authored unless it passes a machine hazard gate. Then it is claimed, proven, and settled: each step its own receipt.

1
Packet
bounded scope + gate passed
2
Claimed
veg crew, signed
3
Proof
photo + GPS + signature, checked
4
Settled
on-chain receipt on Base

✓ Settlement receipt: permanent, public, verifiable

WorkVegetation clearance to radial-clearance spec PlaceCircuit HFRA-118, span 42 (illustrative), SCE service area Proofgeotagged before/after photos · GPS fix · crew signature · proof-check PASS Hazard gateenergized-line + terrain controls validated before authoring SettledBase mainnet · EWP 0x76c17C…A14B Cite foreverappends to circuit + contractor verified wildfire-work history

What changed

Nothing about the field work. The crew cleared the same span the same way. The only difference is that the completion, the record the CPUC and Energy Safety already require SCE to keep, is now an object an investigator, an insurer, or a court can check, instead of an internal entry that surfaces only through discovery. That is the whole product.

Provisioned by EcoWealth · Digital Provisioning Protocol · provenance‑sealed