intermediate work · East Porterville water system, East Porterville CA
Lead the multi-connection WASH verification round across the East Porterville water system, CA (2026-07-10)
East Porterville water system's consolidated connections have grown past a single-point check — someone needs to run the full WASH verification round across every registered connection in one coordinated pass, so the results are comparable visit over visit. Standard: Gold Standard Water Benefit Standard (WBS) — WASH access verification (functionality + safe-use); SDG 6.1/6.2 safely managed drinking water and sanitation. Proof: every registered connection verified to spec in one pass + consolidated summary — Real, Proven, One-of-one Method (Gold Standard Water Benefit Standard (WBS) — WASH access verification (functionality + safe-use verification for a certified water point/system) feeding Water Benefit Certificate (WBC) issuance., ~30-60 min): 1. Navigate to the registered water point (handpump, tap stand, filtration unit, tank) and confirm GPS matches the project's registered asset ID. 2. Photograph the water point and confirm it is operational by test-pumping or test-flowing the point. 3. Verify basic water-quality indicators available on-site (free-chlorine residual test strip or turbidity tube where the project specifies point-of-use treatment) and record the reading. 4. Observe the responsible user/caretaker's safe-water-chain practices (covered storage, clean collection vessel, handwashing station presence/function). 5. Check the asset's maintenance record/logbook for the period since the last visit; note any repairs or downtime. 6. Count or estimate the households/population currently served per the project's registered service area. 7. Complete the WASH functionality + safe-use checklist per the project's monitoring plan. 8. Enter asset ID, GPS, photos, test readings, checklist, and any flagged deficiency into the proof record; sign. Equipment: GPS-capable phone or survey-grade GPS, camera, free-chlorine residual test strips or turbidity tube, stopwatch (flow-rate test), field checklist/tablet, maintenance logbook, PPE (gloves) Done when: GPS matches the registered water-point asset ID within the posting radius; Photo confirming the point is operational, with the test-pump/test-flow result documented; On-site water-quality indicator test performed and recorded where the project specifies point-of-use treatment; WASH functionality + safe-use checklist completed per the project's monitoring plan
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: Gold Standard Water Benefit Standard (WBS) — WASH access verification (functionality + safe-use verification for a certified water point/system) feeding Water Benefit Certificate (WBC) issuance.
Bring
- GPS-capable phone or survey-grade GPS
- camera
- free-chlorine residual test strips or turbidity tube
- stopwatch (flow-rate test)
- field checklist/tablet
- maintenance logbook
- PPE (gloves)
Steps
- 1. Navigate to the registered water point (handpump, tap stand, filtration unit, tank) and confirm GPS matches the project's registered asset ID.
- 2. Photograph the water point and confirm it is operational by test-pumping or test-flowing the point.
- 3. Verify basic water-quality indicators available on-site (free-chlorine residual test strip or turbidity tube where the project specifies point-of-use treatment) and record the reading.
- 4. Observe the responsible user/caretaker's safe-water-chain practices (covered storage, clean collection vessel, handwashing station presence/function).
- 5. Check the asset's maintenance record/logbook for the period since the last visit; note any repairs or downtime.
- 6. Count or estimate the households/population currently served per the project's registered service area.
- 7. Complete the WASH functionality + safe-use checklist per the project's monitoring plan.
- 8. Enter asset ID, GPS, photos, test readings, checklist, and any flagged deficiency into the proof record; sign.
If it does not match the plan
- Water point non-functional or the point-of-use treatment absent/expired -> flag immediately for repair/resupply before the next scheduled visit; never report a non-functional asset as verified.
- Safe-water-chain practice absent (uncovered storage, contaminated collection vessel) -> flag for community WASH follow-up/training; never adjust the household's practice directly.
What counts as done
- GPS matches the registered water-point asset ID within the posting radius
- Photo confirming the point is operational, with the test-pump/test-flow result documented
- On-site water-quality indicator test performed and recorded where the project specifies point-of-use treatment
- WASH functionality + safe-use checklist completed per the project's monitoring plan
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.