intermediate work · Mendocino coast watershed source-protection zone, Fort Bragg CA
Lead the multi-site source-protection round across Mendocino coast watershed source-protection zone, Fort Bragg CA (2026-07-10)
Mendocino coast watershed source-protection zone, Fort Bragg CA's source-protection program has grown past a single site — someone needs to run the full protection-zone round across every registered site in one coordinated pass, so the results are comparable visit over visit. Standard: Gold Standard Water Benefit Standard (WBS) — source-water protection zone monitoring; SDG 6.1/6.6 water resource protection. Proof: every registered site walked to spec in one pass + consolidated summary — Real, Proven, One-of-one Method (Gold Standard Water Benefit Standard (WBS) — source-water protection zone condition walk (catchment/spring/recharge-area buffer inspection) feeding the project's Water Benefit Certificate (WBC) monitoring requirements., ~45-90 min): 1. Navigate to the registered source-protection zone boundary (spring box, recharge basin, wellhead, catchment intake); confirm GPS matches the project's registered site ID. 2. Photograph the source point and the immediate protective perimeter (fencing/buffer condition, vegetation cover, any encroachment). 3. Walk the protection-zone buffer checking for contamination-risk indicators (livestock access, latrine proximity, agrochemical storage/use, solid-waste dumping, open defecation) and log each with a GPS waypoint and photo. 4. Inspect the physical source infrastructure (spring box lid/seal, wellhead cap, intake screen, diversion structure) for damage or breach. 5. Record any encroachment (new structures, cultivation, grazing) inside the registered buffer since the last visit. 6. Note upstream/uphill land-use changes visible from the protection zone that could affect source-water quality. 7. Complete the source-protection condition checklist per the project's WBS monitoring plan. 8. Enter site ID, GPS, photos, checklist, and any flagged risk into the proof record; sign. Equipment: GPS-capable phone or survey-grade GPS, camera, tape measure or laser rangefinder (buffer distance checks), field checklist/tablet, waterproof notebook, PPE (gloves/boots), flagging tape Done when: GPS matches the registered source-protection site ID within the posting radius; Photo of the source point and protective perimeter captured; Full buffer walk completed with every required contamination-risk indicator checked and logged; Source-protection condition checklist completed per the project's monitoring plan
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: Gold Standard Water Benefit Standard (WBS) — source-water protection zone condition walk (catchment/spring/recharge-area buffer inspection) feeding the project's Water Benefit Certificate (WBC) monitoring requirements.
Bring
- GPS-capable phone or survey-grade GPS
- camera
- tape measure or laser rangefinder (buffer distance checks)
- field checklist/tablet
- waterproof notebook
- PPE (gloves/boots)
- flagging tape
Steps
- 1. Navigate to the registered source-protection zone boundary (spring box, recharge basin, wellhead, catchment intake); confirm GPS matches the project's registered site ID.
- 2. Photograph the source point and the immediate protective perimeter (fencing/buffer condition, vegetation cover, any encroachment).
- 3. Walk the protection-zone buffer checking for contamination-risk indicators (livestock access, latrine proximity, agrochemical storage/use, solid-waste dumping, open defecation) and log each with a GPS waypoint and photo.
- 4. Inspect the physical source infrastructure (spring box lid/seal, wellhead cap, intake screen, diversion structure) for damage or breach.
- 5. Record any encroachment (new structures, cultivation, grazing) inside the registered buffer since the last visit.
- 6. Note upstream/uphill land-use changes visible from the protection zone that could affect source-water quality.
- 7. Complete the source-protection condition checklist per the project's WBS monitoring plan.
- 8. Enter site ID, GPS, photos, checklist, and any flagged risk into the proof record; sign.
If it does not match the plan
- Any breach of the physical source infrastructure (broken seal, damaged spring box, exposed wellhead) -> flag immediately for repair before the next scheduled visit; never leave an active contamination pathway unflagged.
- Encroachment or a new contamination-risk indicator inside the registered buffer -> flag for the project proponent/local water committee; never resolve or negotiate access on-site.
What counts as done
- GPS matches the registered source-protection site ID within the posting radius
- Photo of the source point and protective perimeter captured
- Full buffer walk completed with every required contamination-risk indicator checked and logged
- Source-protection condition checklist completed per the project's monitoring plan
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.