Anyone can start here · 700 block of W Truslow Ave, Fullerton, CA 92832

Clear the clogged gutters and downspouts on a Truslow Ave home (2026-07-17)

The survey found this home's gutters packed with leaves and the downspouts dumping straight against the foundation -- the cheapest, fastest fix on the whole ranked list, and the one most likely to be skipped because it looks trivial. It is not trivial: standing water at the foundation is where every weatherization job starts failing again. Standard: Weatherization + insulation/air-sealing upgrade readiness — the family-facing survey that turns a cold, drafty, expensive-to-heat home into a scoped, fundable weatherization package: air-sealing targets, insulation gaps by assembly (attic/wall/floor/rim), ventilation-after-tightening needs, and combustion-safety flags that must clear before any tightening. DOE Weatherization Assistance Program (WAP) field practice + ENERGY STAR Home Upgrade + BPI combustion-safety-first sequencing, under the LBC Energy petal. Observation/planning only — insulation contracting, combustion testing, and utility-program enrollment route to qualified pros/agencies; SDG 7.3/13.2. Proof: before/after photo pairs per gutter run + debris-disposal photo + GPS Method (Weatherization + insulation/air-sealing upgrade readiness — the family-facing survey that turns a cold, drafty, expensive-to-heat home into a scoped, fundable weatherization package: air-sealing targets, insulation gaps by assembly (attic/wall/floor/rim), ventilation-after-tightening needs, and combustion-safety flags that must clear before any tightening. DOE Weatherization Assistance Program (WAP) field practice + ENERGY STAR Home Upgrade + BPI combustion-safety-first sequencing, under the LBC Energy petal. Observation/planning only — insulation contracting, combustion testing, and utility-program enrollment route to qualified pros/agencies; SDG 7.3/13.2.): 1. Photograph each gutter run and downspout outlet as found, noting standing debris and any sag or separated joint. 2. From a stable stepladder (max 6 ft) with a spotter, or from ground level with a gutter-scoop pole, clear leaves and debris by hand into a bucket or tarp. 3. Flush each run with a garden hose from the high end and confirm water exits cleanly at the downspout outlet. 4. Photograph the cleared run from the same vantage and log the debris volume + disposal method. Done when: before/after photo pairs per gutter run + debris-disposal photo + GPS

Where
700 block of W Truslow Ave, Fullerton, CA 92832
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after photo pairs per gutter run + debris-disposal photo + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-17

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 75–150 minutes. Method of record: Weatherization readiness survey (DOE WAP field practice + ENERGY STAR Home Upgrade; BPI combustion-safety-first sequencing; LBC Energy petal; observation/planning only)

Bring

Steps

  1. 1. Confirm scope with the household and record what they actually feel: the cold rooms, the drafts, the winter bill they want lower. Their comfort targets frame the package — this is their claim of a warmer home, not a generic energy audit.
  2. 2. Inventory the envelope by assembly with photos: attic insulation presence + approximate depth/R-level, accessible wall/floor/rim-joist insulation, window/door condition and weatherstripping, and visible bypasses (top plates, chases, recessed lights, attic hatch).
  3. 3. Trace drafts qualitatively (smoke pencil/incense at suspect points on a breezy day or with exhaust fans running) and rank the air-sealing targets; note that quantitative blower-door verification belongs to the weatherization contractor.
  4. 4. Screen combustion safety BEFORE tightening is planned: photograph each combustion appliance + venting, take a CO spot reading, and flag anything (orphaned water heater, corroded flue, suspected backdrafting) that a BPI-qualified pro must clear before ANY air-sealing proceeds.
  5. 5. Check moisture prerequisites: any active leak, bulk-water entry, or damp assembly gets sequenced ahead of insulation (never insulate a wet assembly), and note ventilation needs after tightening (bath/kitchen exhaust, fresh-air strategy).
  6. 6. Assemble the weatherization-readiness package: ranked air-sealing targets, insulation gaps by assembly with rough quantities, combustion-safety flags that gate the work, moisture prerequisites, ventilation-after-tightening notes, and the utility/WAP program paths the household may qualify for.
  7. 7. Enter photos, GPS/address, the assembly inventory, CO readings, and the readiness package; sign. Route combustion clearance to a BPI-qualified pro and installation to insured insulation contractors — the survey scopes, it never installs.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.