intermediate work · the service alley behind the 800 block of E Weldon Ave, Tower District, Fresno, CA 93728

Cold-patch the potholes.

Fund it for $65. Proof lands onchain when it's done.

$65 proposed

Not funded yet. Settles as earned credit, $65 proposed.

Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

Not for you? Pledge backing · free Fund this work · $65

What the work involves

The paved service alley behind the service alley behind the 800 block of E Weldon Ave has gone years without patching. The potholes are deep enough to catch a bike tire and pool standing water that breeds mosquitoes.

Where
the service alley behind the 800 block of E Weldon Ave, Tower District, Fresno, CA 93728 · Open the map
Pay
$65 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
before/after photos of each patch + pothole count/size + material used + GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-10-17
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Photograph each pothole as found and measure its depth.
  2. Clear loose debris and standing water from each hole.
  3. Fill with cold-patch asphalt in compacted lifts per the product instructions.
  4. Tamp and compact each patch level with the surrounding surface and photograph the finished patch.

What counts as done

  • Before photo of each pothole
  • After photo of the finished, compacted patch
  • Count and rough size of potholes patched + material used

Proof is measured against these, not judged by taste.

The standard this serves

Civic Safety Reporting. Civic safety is the craft of noticing for your neighbors: the burned-out light over a dark corner, the sidewalk lip waiting to trip someone, the overgrown hedge hiding a crosswalk. This standard is documentation and coordination only, no repairs: see the hazard clearly, grade how serious it is, record it with a photo and a place, and route it to the people with the authority to fix it. Mastery looks like a neighborhood where problems are found while they are still small. This packet is one clear-eyed report, and one clear report is how every fix begins.

The money and the proof

What is promised, and what is not.

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1784353735893_1ru530q","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.