Anyone can start here · Dodge Park, 667 Sullivant Ave, Columbus OH 43215

Regrade the eroded Scioto Trail approach at Dodge Park (2026-07-17)

The Scioto Trail's approach path at the Dodge Park trailhead has eroded into ruts and exposed roots, tripping runners and bikers at the exact spot where the trail meets the park. Standard: Community-coordination standard, documentation-and-coordination-only; canonical hazard severity tag (minor|moderate|severe|critical). No repair authority. Proof: Before photo of the eroded approach + Fill/grading photos + After photo of the regraded, compacted surface Method (Community-coordination standard, documentation-and-coordination-only; canonical hazard severity tag (minor|moderate|severe|critical). No repair authority.): 1. Photograph the eroded approach and mark the regrade extent. 2. Clear loose debris and fill the ruts with compactable base material. 3. Grade and compact the surface to shed water away from the low points. 4. Photograph the finished, regraded approach from the same vantage. Done when: Before photo of the eroded approach + Fill/grading photos + After photo of the regraded, compacted surface

Where
Dodge Park, 667 Sullivant Ave, Columbus OH 43215
Pay
$80 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before photo of the eroded approach + Fill/grading photos + After photo of the regraded, compacted surface

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-17

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: Community-coordination hazard survey (documentation + coordination only; severity-tagged)

Bring

Steps

  1. 1. Walk the corridor from a safe path; record a GPS waypoint at each hazard.
  2. 2. Photograph each hazard.
  3. 3. Classify the hazard type and assign a severity tag (minor|moderate|severe|critical).
  4. 4. Name the responsible handoff target (BID / city agency / utility).
  5. 5. Enter each hazard's type, severity, GPS, photo, and handoff target into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.