Anyone can start here · East side blocks near East St, Woodland, CA 95776
Survey east-side Woodland storm drain inlets ahead of Yolo Bypass winter flood season (2026-07-18)
Woodland's east side sits closest to the Yolo Bypass floodway, and the neighborhood's storm drains clog fast with leaf litter each fall right when Central Valley winter storms push the Bypass toward capacity. A block-by-block inlet survey before the rains hit tells the next crew exactly which drains need clearing first. Standard: EPA municipal storm drain inspection method + SDG 11 Proof: Photo log of each inlet with a clear/blocked rating Method (EPA municipal storm drain inspection method + SDG 11): 1. Walk a defined block of curbside storm drain inlets before the first fall storm. 2. Photograph each inlet grate and note whether it is clear, partly blocked, or fully blocked. 3. Record the street address or nearest cross street for each inlet. 4. Rank the blocked inlets by severity for the next clearing pass. 5. Note any inlet with standing water already pooling nearby. 6. Submit the ranked list with photos to the next crew. Done when: Photo log of each inlet with a clear/blocked rating
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: EPA green-infrastructure inspection (bioretention / bioswale / permeable pavement function + maintenance)
Bring
- measuring tape
- GPS phone
- camera
- trowel / probe
- data sheet
- gloves
Steps
- 1. Locate the GI asset; record GPS; identify the type (rain garden / bioswale / permeable pavement / tree filter).
- 2. Photograph the asset, its inlet, and its outlet/overflow.
- 3. Check the inlet and outlet for blockage (sediment, trash, mulch) and note whether flow can enter/leave freely.
- 4. Check for standing water and estimate whether it drains within the design window (typically <24-48h after rain); probe media if dry.
- 5. Assess vegetation/media condition and estimate sediment/trash accumulation depth.
- 6. Note erosion, bypass, or structural damage and list the maintenance needed.
- 7. Enter asset type, condition, inlet/outlet status, drainage observation, sediment level, maintenance needs, GPS, photos; sign.
If it does not match the plan
- Standing water persists > 48h after rain -> flag failed infiltration (clogged media) for rehab.
- Inlet or outlet blocked -> flag for cleaning; the asset isn't capturing runoff.
- Erosion, undercutting, or flow bypassing the asset -> flag for repair.
- Documentation only — no digging out media or altering structures.
What counts as done
- Asset type + overall condition recorded
- Inlet + outlet clear/blocked status recorded
- Standing-water / infiltration observation recorded
- Sediment/trash level + maintenance recommendations + GPS + photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.