Clear the basement areaway drains on an invited Sandtown block (2026-07-18)
Sandtown rowhouse areaways fill with leaves and windblown trash, and their clogged floor drains send every storm against the basement door and into the cellar. Baltimore's harder rains are finding every blocked drain in West Baltimore; clearing them is an hour of prevention per house. Standard: Rowhouse areaway drainage maintenance practice; SDG 11. Proof: Before/after photos plus the drain water test Method (Rowhouse areaway drainage maintenance practice; SDG 11.): 1. Confirm the host invitation and clear all debris from the areaway floor by hand. 2. Lift the grate and clear the drain throat to free flow. 3. Bucket-test with clean water and confirm it drains. 4. Reseat the grate and sweep clean. 5. Photograph before, the water test, and after with GPS and date. Done when: Before/after photos plus the drain water test
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 30–75 minutes. Method of record: Rowhouse areaway floor-drain clearing and minor repair — entry-level, no excavation, no below-grade wall work
Bring
- wire brush / hand drain snake (<10 ft reach)
- shop vac or bucket + gloves
- trash bags for debris
- camera + tape measure
Steps
- 1. ASSESS: photograph the areaway floor, drain grate and walls as found; note standing water depth, debris type, and whether the drain outlet appears connected to a functioning line (vs. an unknown or dry-well routing).
- 2. Clear leaves, trash and sediment from the areaway floor and drain grate by hand; bag debris for disposal.
- 3. Lift the drain grate only if it lifts freely by hand and clear the visible trap of debris with a hand auger/drain snake to the depth it reaches naturally; reseat the grate.
- 4. Pour a test bucket of water into the drain and confirm it clears within a few minutes; photograph the finished areaway and note any standing water or slow drainage for the follow-on regrade/waterproof job.
If it does not match the plan
- Standing water that does not clear after grate clearing, or a drain line that appears blocked/collapsed underground -> STOP, do not dig or force the line; name it for the intermediate waterproof/regrade job instead.
- A cracked or actively leaking areaway wall -> photograph and route to a licensed contractor rather than attempting a DIY patch.
What counts as done
- Areaway floor and grate clear of debris in before/after photos
- Water test confirms the drain clears standing water within a few minutes (or the slow-drain finding is documented for the next rung)
- No forced/pried entry into the drain line beyond a hand snake's natural reach
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.