Anyone can start here · Transit stop planting strips along E Nob Hill Blvd, Yakima, WA 98901
Plant a shade tree beside a baking bus stop in east Yakima
Many east Yakima bus stops are a bare pole on a concrete strip, and riders wait in full sun through the hottest valley in Washington. One correctly planted street tree per stop is the cheapest lasting cooling this side of town can get. Standard: EPA Heat Island Reduction guidance + City of Yakima street tree standards; SDG 11 (Sustainable Cities and Communities). Proof: photos of the planted, mulched, watered tree at the stop Method (EPA Heat Island Reduction guidance + City of Yakima street tree standards; SDG 11 (Sustainable Cities and Communities).): 1. Confirm the planting spot with the city's approved street-tree list and call 811 for utility locates. 2. Dig the planting hole twice the width of the root ball and no deeper than the root flare. 3. Set the tree straight, backfill with native soil, and water it in thoroughly. 4. Mulch a ring around the tree keeping mulch off the trunk, and stake only if the site is windy. 5. Photograph the planted tree beside the bus stop from two angles, GPS-tagged and dated. Done when: photos of the planted, mulched, watered tree at the stop
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 90–240 minutes. Method of record: Urban heat-island mitigation for civic hard surfaces and pedestrian waiting areas — high-solar-reflectance (cool) coatings on sidewalks/schoolyards/plazas and shade-sail/structure installs at bus stops and gathering points. EPA Heat Island Reduction Program cool-pavement guidance + ASTM E1918 solar-reflectance testing; municipal right-of-way permit where the surface or structure sits in the public way.
Bring
- camera + infrared/surface thermometer
- push broom + pressure washer (surface prep)
- roller/squeegee applicators for cool-pavement coating (manufacturer-specified system only)
- cones/barricades for the work-zone perimeter
- post-hole digger or core drill + concrete anchors (shade-structure footings)
- tape measure + level
- gloves + safety glasses + respirator as coating manufacturer specifies
Steps
- 1. Photograph the target surface or waiting area as found, including a mid-day surface-temperature reading, and confirm the right-of-way permit and any utility locates before ground disturbance.
- 2. Set cones/barricades for a pedestrian-safe work zone; pressure-wash and clear the surface of debris, or confirm the shade-structure footing location clears underground utilities (811 locate) and meets the manufacturer's anchor spec.
- 3. Apply the cool-pavement coating system per manufacturer instructions in the specified number of coats and cure time, OR set and anchor the shade structure/sail per its engineering spec, keeping clearances for accessible passage.
- 4. Verify: for coatings, confirm even coverage with no missed sections and let the full cure window pass before reopening to traffic; for structures, confirm anchor torque and structural stability by hand-test.
- 5. Take a matching-vantage after photo and a same-conditions surface-temperature reading; log the reading delta.
- 6. Enter before/after photos, the temperature readings, materials/product used, and the permit reference into the proof record; sign.
If it does not match the plan
- No right-of-way permit on file for public-way work -> STOP: do not apply coating or set a structure until the permit is confirmed.
- 811 utility locate not confirmed before any ground disturbance for a footing -> STOP: reschedule after locates are marked.
- Coating manufacturer's minimum surface-prep or cure-time spec cannot be met (rain in the cure window, surface too degraded) -> reschedule rather than apply out of spec.
What counts as done
- Before and after photos from a matching vantage, with mid-day surface-temperature readings logged both times
- Coating shows even, full coverage with no missed sections (or structure passes a hand-test for anchor stability)
- Pedestrian accessibility/clearance maintained through and after the work
- Right-of-way permit and any utility-locate reference recorded
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.