intermediate work · Approved greenway bank stretch near Roosevelt Park, Rapid City, SD 57701

Plant willow stakes along Rapid Creek's eroding greenway banks

Stretches of Rapid Creek's banks through town are bare and cutting back, sending sediment downstream and eating the greenway edge. Live willow stakes driven into the moist bank root into a living wall — the same low-tech fix creeks have used forever. Standard: NRCS streambank bioengineering guidance (live staking); SDG 6 (Clean Water and Sanitation). Proof: photos of the staked bank from both directions with stake count Method (NRCS streambank bioengineering guidance (live staking); SDG 6 (Clean Water and Sanitation).): 1. Coordinate with the city greenway contact to confirm the approved bank stretch and stake source. 2. Cut live willow stakes to length and keep them moist until planting. 3. Drive stakes into the moist bank at the marked spacing, buds up, two-thirds below ground. 4. Flag the planted stretch and water in if dry. 5. Photograph the planted bank from both directions, GPS-tagged and dated. Done when: photos of the staked bank from both directions with stake count

Where
Approved greenway bank stretch near Roosevelt Park, Rapid City, SD 57701
Pay
$360 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
photos of the staked bank from both directions with stake count

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-18

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: EPA dry-weather / AMD field screening

Bring

Steps

  1. 1. Navigate to the outfall/reach; record GPS; photograph it, capturing any visible flow or staining.
  2. 2. Note whether flow is present in dry weather (yes/no).
  3. 3. Measure and record pH, conductivity, and each specified analyte per kit instructions.
  4. 4. Log any color, odor, floc, or aquatic-life observation.
  5. 5. Enter all readings with units, GPS, time, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.