Anyone can start here · Invited yards near S Walnut St, Lumberton, NC 28358

Haul the storm debris off an invited Lumberton yard before it molds and breeds (2026-07-19)

Storm after storm leaves Lumberton yards with soaked furniture, downed limbs, and ruined materials that owners — often elderly or still rebuilding — cannot move themselves. Debris that sits breeds mosquitoes, molds, and marks a block as abandoned. One yard cleared is one household unstuck. Standard: FEMA post-storm debris management guidance + SDG 11 (Sustainable Cities and Communities). Proof: before/after yard photos plus disposal or set-out evidence Method (FEMA post-storm debris management guidance + SDG 11 (Sustainable Cities and Communities).): 1. Confirm the host's invitation and walk the yard together to agree what goes. 2. Sort debris into vegetation, bulky items, and bagged trash, and stage or load by category. 3. Haul to the legal disposal or set out per the city's storm-debris pickup rules, keeping any receipt. 4. Leave the yard raked clean. 5. Photograph the yard before and after plus the staged or hauled loads, GPS-tagged and dated. Done when: before/after yard photos plus disposal or set-out evidence

Where
Invited yards near S Walnut St, Lumberton, NC 28358
Pay
$232 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
before/after yard photos plus disposal or set-out evidence

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.