Anyone can start here · Community garden beds, west Tulare, CA 93274

Top-dress west Tulare's community garden beds with finished compost (2026-07-19)

The shared beds serving west Tulare grow in tired, low-organic soil that bakes hard by August. A quarterly compost top-dress rebuilds the soil sponge so the same water grows twice the food. Standard: NRCS soil-health and compost guidance; SDG 15 Life on Land. Proof: Before/after photos of every top-dressed bed Method (NRCS soil-health and compost guidance; SDG 15 Life on Land.): 1. Collect finished compost from the marked pile. 2. Weed each bed and lightly loosen the damp surface. 3. Spread one to two inches of compost across each bed and around perennials. 4. Water in to settle. 5. Photograph each bed before and after, GPS and date. Done when: Before/after photos of every top-dressed bed

Where
Community garden beds, west Tulare, CA 93274
Pay
$160 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after photos of every top-dressed bed

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 90–360 minutes. Method of record: Compost application per NRCS CPS 336 / CDFA Healthy Soils quantification (rate, quality, incorporation for the site) — finished compost only; assess→apply→verify

Bring

Steps

  1. 1. ASSESS: photograph the application area as found, record GPS boundary and area, and confirm the application rate (tons/acre or inches of depth) and compost quality documentation against the plan.
  2. 2. Calibrate the rate (bucket-per-area or spreader pass test) so the applied depth matches the plan.
  3. 3. Apply compost evenly across the area; keep material out of waterways, drains, and off pavement (sweep any spill back onto soil).
  4. 4. Incorporate or leave surface-applied exactly per the plan (no-till surface application is valid under CPS 336).
  5. 5. VERIFY: photograph the finished application from matching vantage + a depth-check photo (ruler in the applied layer) at ≥3 points; log source, quantity, rate, and date as the application record.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.