Anyone can start here · Approved creek reaches, Yreka Creek Greenway south end, Yreka, CA 96097

Plant willow stakes along Yreka Creek's bare winter banks (2026-07-19)

Yreka Creek runs through town with long stretches of bare, slumping bank that bleed sediment downstream toward the Shasta River's salmon water every storm. Dormant-season willow stakes โ€” cut, sharpened, and driven into the moist bank โ€” root into living bank armor by summer, the oldest and cheapest bank repair there is. Standard: NRCS streambank bioengineering practice (live willow staking); SDG 15 Life on Land. Proof: Before/after bank photos with stake count Method (NRCS streambank bioengineering practice (live willow staking); SDG 15 Life on Land.): 1. Work a host- or city-approved reach in the dormant season and photograph the bare bank. 2. Cut willow stakes from the approved donor stand, 2-3 feet long, angle-cut at the base. 3. Drive stakes into the moist bank face on the marked spacing, two-thirds buried, buds up. 4. Trim each planted stake to a hand's width above ground. 5. Photograph the staked reach and log the count. Done when: Before/after bank photos with stake count

Where
Approved creek reaches, Yreka Creek Greenway south end, Yreka, CA 96097
Pay
$200 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after bank photos with stake count

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30โ€“60 minutes. Method of record: EPA dry-weather / AMD field screening

Bring

Steps

  1. 1. Navigate to the outfall/reach; record GPS; photograph it, capturing any visible flow or staining.
  2. 2. Note whether flow is present in dry weather (yes/no).
  3. 3. Measure and record pH, conductivity, and each specified analyte per kit instructions.
  4. 4. Log any color, odor, floc, or aquatic-life observation.
  5. 5. Enter all readings with units, GPS, time, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.