Anyone can start here · Yolo Bypass-edge residential lot, Woodland, CA 95776
Build a rain garden on Woodland's Yolo Bypass-edge blocks to soak up storm runoff.
Fund it for $200. Proof lands onchain when it's done.
$200 proposed
Not funded yet. Settles as earned credit, $200 proposed.
- ProofPhoto of finished rain garden with plantings
- Open until2026-10-19
- Levelentry
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
Not for you? Pledge backing · free Fund this work · $200
What the work involvesThe blocks closest to the Yolo Bypass on Woodland's east side send storm runoff straight to already-strained drains every winter. A shallow rain garden planted with native, water-tolerant plants catches that first flush before it reaches the pipe.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Choose a low spot in the yard at least 10 feet from the foundation.
- Dig a shallow basin roughly 6 inches deep, sloped toward the low point.
- Line the basin edge with mulch or river rock to slow incoming flow.
- Plant native, water-tolerant grasses and perennials in the basin.
- Water the new plantings in thoroughly.
- Photograph the finished rain garden from two angles.
What counts as done
- Photo of dug basin
- Photo of planted rain garden
- GPS pin of site
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1784517002419_vch76n8","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.