intermediate work · Broderick-Bryte home, West Sacramento, CA 95605

Install a battery-backup sump pump at a low-lying Broderick-Bryte home

Broderick-Bryte sits behind the Sacramento River's reconstructed levee system, and a power outage during a heavy winter storm can knock out a sump pump right when a low-lying home needs it most. A plug-in battery backup keeps the pump running through the outage. Standard: FEMA residential flood mitigation guidance + SDG 11 Proof: Photo of installed backup unit and passed activation test Method (FEMA residential flood mitigation guidance + SDG 11): 1. Confirm the existing sump pump is in working order before starting. 2. Connect the battery-backup unit using its included plug-in wiring only — never open the electrical panel. 3. Mount the backup battery on a shelf above expected water line. 4. Test the backup by unplugging the primary pump and confirming the backup activates. 5. Reset the system to normal operation. 6. Photograph the installed backup unit and the successful test. Done when: Photo of installed backup unit and passed activation test

Where
Broderick-Bryte home, West Sacramento, CA 95605
Pay
$380 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of installed backup unit and passed activation test

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-18

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.