Clear a Raiwaqa storm drain grate before the cyclone season (2026-07-19)

Roadside storm drains in Raiwaqa clog with dry-season litter and sediment, so the season's first heavy rain backs up onto settlement roads before the drain can move any water at all. Standard: UN-Habitat urban drainage maintenance guidance; SDG 11 (resilient cities). Proof: Before/after photo of cleared drain + debris log Method (UN-Habitat urban drainage maintenance guidance; SDG 11 (resilient cities).): 1. Confirm the drain grate is dry and low-flow before starting; skip if water is moving. 2. Lift the grate with a hand tool and set it aside on dry ground. 3. Clear leaves, sediment, and litter from the drain mouth by hand, bagging debris. 4. Reseat the grate securely and photograph the cleared drain. 5. Log the debris weight or bag count and drop bags at the site the host names. Done when: Before/after photo of cleared drain + debris log

Where
Roadside storm drain, Raiwaqa, Suva, Fiji
Pay
$180 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Before/after photo of cleared drain + debris log

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-19

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–180 minutes. Method of record: Storm drain inlet surface cleaning + minor grate/apron repair per EPA MS4 stormwater BMP maintenance — SURFACE WORK FROM THE CURB ONLY; never enter the drain, never lift beyond the grate; assess→clear/repair→verify

Bring

Steps

  1. 1. ASSESS: photograph the inlet as found (grate, apron, gutter approach), note blockage type and any damage (broken grate, displaced apron concrete), and record GPS.
  2. 2. Set cones at the curb work zone; all work is from the sidewalk/curb — never step into the traffic lane and never enter, reach into, or open the drain structure.
  3. 3. Clear debris, sediment, and litter from the grate surface and the gutter approach with the rake/grabber; bag and dispose of it properly (green waste separated).
  4. 4. Minor repair within surface scope: re-seat a displaced grate that lifts freely by hand from above, patch apron spalls with cold-patch where the city standard allows; anything more is documented, not attempted.
  5. 5. VERIFY: photograph the cleared inlet from the same vantage, pour a bucket of clean water at the gutter approach to show flow into the inlet, and report any structural damage to the municipal stormwater line (311/MS4 contact) with photos.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.