intermediate work · Invited home yard, Colonia San Miguel Teotongo, Iztapalapa, CDMX 09760

Build a household cistern so captured rain covers more of the dry weeks

Once a household already runs a rain barrel, the real fix for Iztapalapa's weekly water-truck cycle is more storage — a larger sealed cistern that banks rainy-season capture for the weeks between deliveries. Many families currently store water in uncovered tanks that lose volume and collect debris. A proper cistern with a tap and overflow line multiplies how long stored water lasts and keeps it cleaner. Standard: WHO household water storage guidance; SDG 6 (Clean Water and Sanitation) Proof: Photo of installed cistern with tap and overflow plus host confirmation Method (WHO household water storage guidance; SDG 6 (Clean Water and Sanitation)): 1. Confirm the host invites the work and walk the roof runoff and existing storage setup together. 2. Set the cistern tank on a stable, leveled base at ground level, never elevated on unsupported blocks. 3. Connect the roof runoff line and any existing rain barrel as a first-flush feed into the cistern inlet. 4. Install a tap near the base and a screened overflow so excess water drains away from the foundation. 5. Photograph the completed cistern, tap, and overflow with the host present and record the capture-ready date. Done when: Photo of installed cistern with tap and overflow plus host confirmation

Where
Invited home yard, Colonia San Miguel Teotongo, Iztapalapa, CDMX 09760
Pay
$340 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of installed cistern with tap and overflow plus host confirmation

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-18

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: EPA WaterSense fixture flow-rate + leak audit

Bring

Steps

  1. 1. Confirm the address; get a staff escort; photograph each fixture group.
  2. 2. Measure flow rate at each faucet/shower with the bag-and-timer method; record gallons per minute (gpm).
  3. 3. Test each toilet for leaks with a dye tablet (wait 10 min, check for color in the bowl); record flush volume.
  4. 4. Inspect fixtures, meters, and irrigation for visible leaks/drips; note each.
  5. 5. Read the water meter with all fixtures off; note any movement (indicates a hidden leak).
  6. 6. Rank WaterSense fixture upgrades + leak repairs by estimated water/cost savings.
  7. 7. Record flow rates, leak results, meter check, ranked measures, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.