intermediate work · Surveyed vacant lot, Zona 3, Guatemala City 01003

Build a raised garden bed on a surveyed Zone 3 vacant lot

Once a vacant Zone 3 lot has been surveyed and confirmed ready, the next step is turning that flagged corner into a working raised bed a household or community group can actually grow food in. This intermediate build follows directly from the site's condition survey and stays on the lot area already confirmed clear of debris. It gives the neighborhood real growing space away from the landfill corridor. Standard: FAO urban agriculture guidance; SDG 2 (Zero Hunger) Proof: Photo of the completed raised bed on the surveyed lot Method (FAO urban agriculture guidance; SDG 2 (Zero Hunger)): 1. Confirm the lot was flagged ready by the prior condition survey. 2. Clear any remaining light debris from the footprint. 3. Frame the bed with reclaimed timber or blocks. 4. Fill with a topsoil-and-compost mix and rake level. 5. Photograph the finished bed and record the build date. Done when: Photo of the completed raised bed on the surveyed lot

Where
Surveyed vacant lot, Zona 3, Guatemala City 01003
Pay
$220 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
Photo of the completed raised bed on the surveyed lot

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-09-18

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 60–180 minutes. Method of record: Vacant/blighted residential-parcel stewardship — condition survey, native low-mow meadow seeding, and community raised-bed conversion. USDA/SARE sustainable land-conversion practice + Xerces Society no-till native-seeding guidance; proceeds only with the parcel owner (private owner, or the city/county land bank) having invited or authorized the work at claim time.

Bring

Steps

  1. 1. Confirm parcel ownership/authorization status (city/county land bank listing or private-owner invitation) and photograph the lot as found, noting dumped debris, standing water, and existing vegetation.
  2. 2. Clear loose trash and dumped debris to a safe hauling point; document anything too large or hazardous for hand removal rather than forcing it.
  3. 3. For the meadow variant: lightly rake the surface for seed-to-soil contact (no deep tillage) and broadcast the native low-mow mix at the labeled rate. For the raised-bed variant: site and build the bed frame level, back-fill with the planned soil mix, and confirm drainage.
  4. 4. Water in the seeding or the finished bed, and mark the treated area's boundary (flags or a low border) so it reads as tended, not abandoned.
  5. 5. Photograph the finished area from the same vantage as the before photo and log the treated square footage.
  6. 6. Enter the ownership/authorization reference, before/after photos, and the treatment log into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.