intermediate work · Surveyed vacant lot, Zona 3, Guatemala City 01003
Build a raised garden bed on a surveyed Zone 3 vacant lot
Once a vacant Zone 3 lot has been surveyed and confirmed ready, the next step is turning that flagged corner into a working raised bed a household or community group can actually grow food in. This intermediate build follows directly from the site's condition survey and stays on the lot area already confirmed clear of debris. It gives the neighborhood real growing space away from the landfill corridor. Standard: FAO urban agriculture guidance; SDG 2 (Zero Hunger) Proof: Photo of the completed raised bed on the surveyed lot Method (FAO urban agriculture guidance; SDG 2 (Zero Hunger)): 1. Confirm the lot was flagged ready by the prior condition survey. 2. Clear any remaining light debris from the footprint. 3. Frame the bed with reclaimed timber or blocks. 4. Fill with a topsoil-and-compost mix and rake level. 5. Photograph the finished bed and record the build date. Done when: Photo of the completed raised bed on the surveyed lot
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 60–180 minutes. Method of record: Vacant/blighted residential-parcel stewardship — condition survey, native low-mow meadow seeding, and community raised-bed conversion. USDA/SARE sustainable land-conversion practice + Xerces Society no-till native-seeding guidance; proceeds only with the parcel owner (private owner, or the city/county land bank) having invited or authorized the work at claim time.
Bring
- camera + tape measure
- trash grabber/rake + heavy-duty bags for debris
- hand tools: shovel, hard rake, hand tiller (no-till surface prep only)
- native low-mow seed mix appropriate to the region, or raised-bed lumber/soil for the build variant
- gloves + closed-toe boots + eye protection
- wheelbarrow
Steps
- 1. Confirm parcel ownership/authorization status (city/county land bank listing or private-owner invitation) and photograph the lot as found, noting dumped debris, standing water, and existing vegetation.
- 2. Clear loose trash and dumped debris to a safe hauling point; document anything too large or hazardous for hand removal rather than forcing it.
- 3. For the meadow variant: lightly rake the surface for seed-to-soil contact (no deep tillage) and broadcast the native low-mow mix at the labeled rate. For the raised-bed variant: site and build the bed frame level, back-fill with the planned soil mix, and confirm drainage.
- 4. Water in the seeding or the finished bed, and mark the treated area's boundary (flags or a low border) so it reads as tended, not abandoned.
- 5. Photograph the finished area from the same vantage as the before photo and log the treated square footage.
- 6. Enter the ownership/authorization reference, before/after photos, and the treatment log into the proof record; sign.
If it does not match the plan
- No ownership/authorization reference available (not on a land-bank list, no owner contact) -> STOP: document only, do not clear or plant; route to the city land-bank program for authorization.
- Debris includes anything suggesting hazardous dumping (drums, unlabeled chemical containers, sharps) -> STOP: do not handle; photograph from a safe distance and report to 311/code enforcement instead of clearing it yourself.
- Standing water present with mosquito larvae or a suspected illicit discharge source -> document and report to the MS4/311 line before proceeding with ground work.
What counts as done
- Parcel ownership/authorization reference recorded before any work begins
- Before and after photos from a matching vantage showing debris cleared and the meadow seeded or bed built
- Treated area boundary clearly marked so the lot reads as actively stewarded
- Treated square footage and materials (seed mix or bed lumber/soil) logged
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.