Anyone can start here · public low-water crossing on US Highway 377 over the South Llano River, south of Junction, TX 76849

Document debris and gravel-bar buildup at a public low-water crossing on US 377, site 2, public low-water crossing on US Highway 377 over the South Llano River, south of Junction, TX 76849 (2026-07-24)

A public low-water crossing on US 377 south of Junction carries drifted gravel and log debris with no photo record of the buildup, and the next Hill Country flash-flood downpour could pile water higher across the crossing than county road crews expect. Standard: FEMA floodplain + green-infrastructure siting screen, applied here to Hill Country flash-flood-alley low-water crossings and roadside ditches around Junction. SDG 11.5 disaster resilience. Proof: dry-conditions confirm + document-only stand-off photo log + debris-type note + GPS + ranked follow-on note Method (FEMA floodplain + green-infrastructure siting screen, applied here to Hill Country flash-flood-alley low-water crossings and roadside ditches around Junction. SDG 11.5 disaster resilience.): 1. 1. In dry conditions with no flowing water across the crossing, observe and photograph the crossing's debris and gravel-bar buildup from the road shoulder. 2. 2. Never step onto the crossing slab itself or into the channel; stay on the dry road shoulder or bank the entire visit. 3. 3. Note the approximate debris type (gravel, log jam, trash) and whether it appears to be narrowing the flow path. 4. 4. Record a ranked follow-on note naming the crossing for the county road department's debris-clearing crew. Done when: dry-conditions confirm + document-only stand-off photo log + debris-type note + GPS + ranked follow-on note

Where
public low-water crossing on US Highway 377 over the South Llano River, south of Junction, TX 76849
Pay
$90 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
dry-conditions confirm + document-only stand-off photo log + debris-type note + GPS + ranked follow-on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-23

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen

Bring

Steps

  1. 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
  2. 2. Photograph deposited sediment / affected area.
  3. 3. Measure deposition depth at representative points.
  4. 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
  5. 5. Note debris, hazards, and the extent (sketch).
  6. 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.