Anyone can start here · College Street (US Highway 377/83) corridor, Junction, TX 76849 (public right-of-way)
Hand-clear surface debris from a public roadside drainage ditch on College Street, site 3, College Street (US Highway 377/83) corridor, Junction, TX 76849 (public right-of-way) (2026-07-24)
Windblown litter and cedar brush pile up along this public roadside ditch in Junction, and every bit left there is one Hill Country flash-flood downpour away from backing water across the town's core corridor. Standard: FEMA floodplain + green-infrastructure siting screen, applied here to Hill Country flash-flood-alley low-water crossings and roadside ditches around Junction. SDG 11.5 disaster resilience. Proof: before/after photos + debris-volume log + dry-conditions confirm + GPS Method (FEMA floodplain + green-infrastructure siting screen, applied here to Hill Country flash-flood-alley low-water crossings and roadside ditches around Junction. SDG 11.5 disaster resilience.): 1. 1. Walk the dry, accessible top of a public roadside drainage ditch along the College Street corridor under normal, non-storm conditions and photograph the debris as found. 2. 2. Hand-clear surface trash, cedar brush, and leaf litter from the ditch top, bagging debris for haul-off. 3. 3. Never enter standing water or a flowing ditch channel, surface-edge clearing only in calm, dry conditions. 4. 4. Photograph the cleared ditch edge from the matching before vantage and log the debris volume removed. Done when: before/after photos + debris-volume log + dry-conditions confirm + GPS
How this work is done
A documented method, so this packet comes out the same whoever does it. Typically 45–90 minutes. Method of record: FEMA floodplain + green-infrastructure siting screen
Bring
- GPS phone
- tape/ruler for deposition depth
- metals field kit (if sediment screen in scope)
- boots + gloves
- camera
Steps
- 1. Confirm post-event conditions are safe; navigate to the site; record GPS.
- 2. Photograph deposited sediment / affected area.
- 3. Measure deposition depth at representative points.
- 4. If a sediment contaminant screen is in scope, run the metals field kit and record values.
- 5. Note debris, hazards, and the extent (sketch).
- 6. Enter depth, any analytes, hazard notes, GPS, photos into the proof record; sign.
If it does not match the plan
- Unstable ground / submerged debris / contaminated water -> document from safe footing; do not enter.
- Elevated metals in deposited sediment -> flag before any reuse; recommend lab confirm.
What counts as done
- Deposition depth recorded at representative points
- Metals screen recorded (if in scope)
- Debris/hazard note + extent sketch
- GPS waypoint + timestamped photos
Proof is measured against these, not judged by taste.
Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.