Anyone can start here · Coleto Creek Park, 365 Coleto Park Road, Victoria, TX 77905 (public Guadalupe-Blanco River Authority park)

Document Coleto Creek reservoir shoreline condition at Coleto Creek Park, segment 2, Coleto Creek Park, 365 Coleto Park Road, Victoria, TX 77905 (public Guadalupe-Blanco River Authority park) (2026-07-28)

A stretch of reservoir shoreline at this public park has no current condition baseline, and invasive shoreline vegetation is crowding out the native riparian cover that holds this bank against wave and wind erosion. Standard: US EPA Rapid Bioassessment Protocols plus watershed-health condition assessment practice, applied here to the lower Guadalupe River at Riverside Park, Coleto Creek Reservoir, and the San Antonio River delta corridor at Goliad in the Texas Coastal Bend interior. SDG 6.6 and 15.1. Proof: document-only stand-off photo log + shoreline-length estimate + GPS + ranked follow-on note Method (US EPA Rapid Bioassessment Protocols plus watershed-health condition assessment practice, applied here to the lower Guadalupe River at Riverside Park, Coleto Creek Reservoir, and the San Antonio River delta corridor at Goliad in the Texas Coastal Bend interior. SDG 6.6 and 15.1.): 1. 1. From an accessible park shoreline trail, photograph invasive shoreline vegetation encroachment and bare-bank extent without leaving the trail. 2. 2. Note the approximate length of shoreline affected and any active bank erosion observed. 3. 3. Photograph the nearest accessible trail marker or park reference point for the crew's reference. 4. 4. Record a ranked follow on note naming the segment for the restoration crew. Done when: document-only stand-off photo log + shoreline-length estimate + GPS + ranked follow-on note

Where
Coleto Creek Park, 365 Coleto Park Road, Victoria, TX 77905 (public Guadalupe-Blanco River Authority park)
Pay
$90 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash. You see which before you claim, never after.

Proof
document-only stand-off photo log + shoreline-length estimate + GPS + ranked follow-on note

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-27

How this work is done

A documented method, so this packet comes out the same whoever does it. Typically 30–60 minutes. Method of record: EPA dry-weather / AMD field screening

Bring

Steps

  1. 1. Navigate to the outfall/reach; record GPS; photograph it, capturing any visible flow or staining.
  2. 2. Note whether flow is present in dry weather (yes/no).
  3. 3. Measure and record pH, conductivity, and each specified analyte per kit instructions.
  4. 4. Log any color, odor, floc, or aquatic-life observation.
  5. 5. Enter all readings with units, GPS, time, and photos into the proof record; sign.

If it does not match the plan

What counts as done

Proof is measured against these, not judged by taste.

Claim it on the board

Claiming is free. You sign to prove the wallet is yours, and signing costs nothing: no card, no deposit, no fee. An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.