intermediate work · Approved bank section, Jordan River Parkway near 200 South, Salt Lake City, UT 84104

Plant willow stakes to rebuild the Jordan River's west-side banks.

Fund it for $320. Proof lands onchain when it's done.

$320 proposed

Not funded yet. Settles as earned credit, $320 proposed.

Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.

Not for you? Pledge backing · free Fund this work · $320

What the work involves

Bare, eroding stretches of the Jordan River's west-side banks dump sediment toward the Great Salt Lake and offer nothing to the birds that depend on this hemispheric flyway corridor. Live willow stakes driven in dormancy grow into bank-holding thickets: cheap, traditional, effective restoration.

Where
Approved bank section, Jordan River Parkway near 200 South, Salt Lake City, UT 84104 · Open the map
Pay
$320 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
Staked-bank photos + count with GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-10-18
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Identify the eroding bank section with the host steward or commission contact.
  2. Cut dormant willow stakes from a permitted donor stand, marking top ends.
  3. Drive stakes two-thirds deep at close spacing across the eroding face from the stable upper bank.
  4. Tamp soil around each stake and trim tops.
  5. Photograph the staked bank and record count with date and GPS.

What counts as done

  • Before and after bank photos
  • Stake count and spacing note
  • Date and GPS record

Proof is measured against these, not judged by taste.

The standard this serves

Watershed Health. A watershed is everything the land pours into a stream, and the stream keeps the record. The EPA's bioassessment method reads that record through the small creatures living in the gravel: mayflies and caddisflies mean clean water, only worms and midges mean trouble. Mastery looks like a person who can wade one riffle with a net and tell you how the whole valley is doing. That skill is built sample by sample. This packet is one of them: one site, one careful count, one entry in the long record of a stream.

The money and the proof

What is promised, and what is not.

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788395118414_2909i5h","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.