Anyone can start here · Approved curb inlets near James P. Brawley Dr NW, Atlanta, GA 30318

Mark the westside storm drains that feed Proctor Creek.

Fund it for $160. Proof lands onchain when it's done.

$160 proposed

Not funded yet. Settles as earned credit, $160 proposed.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

Not for you? Pledge backing · free Fund this work · $160

What the work involves

Everything dumped or spilled on English Avenue's streets surfaces in Proctor Creek, the westside's long-abused waterway now under slow restoration. Curb markers saying so, at every inlet on the route, measurably cut oil pours and litter. It is also how a neighborhood learns where its creek actually starts: at its own curbs.

Where
Approved curb inlets near James P. Brawley Dr NW, Atlanta, GA 30318 · Open the map
Pay
$160 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
Photo of each marked inlet with GPS

This is exactly what gets it approved. Nothing settles without it.

Level
entry
Open until
2026-10-18
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Get the marker kit and approved inlet list from the city or watershed group contact.
  2. Sweep each inlet face clean: surface only, never reaching inside.
  3. Apply the 'Drains to Proctor Creek' marker per kit instructions.
  4. Log each marked inlet.
  5. Photograph each finished marker with GPS and date.

What counts as done

  • Photo of each finished marker, GPS and date
  • Marked-inlet log
  • Street wide shot

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

The money and the proof

What is promised, and what is not.

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788400002448_pi7wwxv","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.