Anyone can start here · Invited home near West Grand Ave, Grover Beach, CA 93433
Redirect roof runoff away from a low-lying Grover Beach home's foundation.
Fund it for $180. Proof lands onchain when it's done.
$180 proposed
Not funded yet. Settles as earned credit, $180 proposed.
- ProofBefore/after photo of the redirected downspout
- Open until2026-10-18
- Levelentry
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
Not for you? Pledge backing · free Fund this work · $180
What the work involvesSome Grover Beach blocks near Meadow Creek sit low enough that heavy winter rain pools against homes whose downspouts still discharge right at the foundation. Redirecting the downspout out onto a splash block cuts the water pressure at the base of the wall.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Photograph the current downspout discharge point.
- Attach a redirect extension or splash block to carry water at least 6 feet from the foundation.
- Check the new discharge point does not send water onto a neighbor's property.
- Confirm water flows freely through the extension.
- Photograph the finished redirect with GPS and date.
What counts as done
- Before photo of discharge point
- After photo with GPS/date
- Note of new discharge distance from foundation
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788403882555_qnjln5e","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.