intermediate work · Reynolds Avenue, Chicora-Cherokee, North Charleston, SC

Build a rain garden along Reynolds Avenue.

Fund it for $400. Proof lands onchain when it's done.

$400 proposed

Not funded yet. Settles as earned credit, $400 proposed.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

Not for you? Pledge backing · free Fund this work · $400

What the work involves

Street runoff on Reynolds Avenue in Chicora-Cherokee has nowhere to go before it reaches the already overloaded storm system, and a rain garden gives it somewhere to soak in first.

Where
Reynolds Avenue, Chicora-Cherokee, North Charleston, SC · Open the map
Pay
$400 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
Before/after photos of the rain garden and runoff path.

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-10-18
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. Mark out the rain garden footprint at Reynolds Avenue, Chicora-Cherokee, North Charleston, SC where runoff already collects.
  2. Dig a shallow basin and set the soil aside for backfill.
  3. Mix compost into the basin soil to improve infiltration.
  4. Plant water-tolerant native plants in the basin and mulch around them.
  5. Direct the downspout or runoff path into the basin and photograph the finished garden.

What counts as done

  • before photo
  • after photo
  • GPS tag
  • plant list

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

The money and the proof

What is promised, and what is not.

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788414388299_3364yy1","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.