intermediate work · Whittier St, Juneau, AK
Build a rain garden to soak up storm flow from a downtown flats yard.
Fund it for $400. Proof lands onchain when it's done.
$400 proposed
Not funded yet. Settles as earned credit, $400 proposed.
- ProofPhotos show a planted, mulched basin that drains within 24 hours
- Open until2026-10-18
- Levelintermediate
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
Not for you? Pledge backing · free Fund this work · $400
What the work involvesOnce roof runoff is captured in the barrel, the next step for this downtown flats property is handling street-level storm flow that pools in the yard during heavy rain. A rain garden gives that water somewhere to soak in instead of running to the storm drain.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- Choose a low point in the yard away from the foundation
- Dig a shallow basin and grade the sides gently
- Amend the soil with compost for better infiltration
- Plant water-tolerant native species in the basin
- Mulch the basin and confirm it drains within a day after watering
What counts as done
- dated before-work photo
- dated after-work photo
- GPS location tag
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788419749202_u34ussk","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.