advanced work · the public city park in Beeville, TX 78102, Bee County
Grind down a lifted sidewalk trip hazard lip near the Beeville city park, site 1, the public city park.
Fund it for $160. Proof lands onchain when it's done.
$160 proposed
Not funded yet. Settles as earned credit, $160 proposed.
- Proofbefore after photos plus lip height measurement plus bevel angle confirm plus GPS
- Open until2026-10-03
- Leveladvanced
Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
Not for you? Pledge backing · free Fund this work · $160
What the work involvesA sidewalk panel near the Beeville city park is lifted at a joint, leaving a lip too shallow to warrant a full panel repour but sharp enough to catch a shoe or a wheelchair caster.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- right-of-way permit + traffic cones/barricades and signage
- wet-cut saw or grinder with water feed + vacuum (dust control), or paver lift/reset tools
- permeable paving material (permeable pavers/pervious mix) + bedding aggregate + compactor
- 2-ft level / smart level + measuring wheel + camera
Steps
- 1. ASSESS: measure and photograph each displaced/cracked panel (lift height, cross-slope, ponding), mark the repair extent, and confirm the right-of-way permit and utility locates (811) before any cutting.
- 2. Set up cones/barricades and a safe pedestrian detour; keep all work out of the traffic lane.
- 3. Remove or wet-cut the failed section with water-fed dust controls; excavate to the design subbase and correct the root or subgrade cause (root-prune only per the city arborist standard).
- 4. Place open-graded base and the permeable surface (pavers or pervious mix) to ADA/PROWAG slope and lippage limits; compact and edge.
- 5. VERIFY: check cross-slope ≤2% and vertical discontinuity ≤1/4 inch, water-test infiltration, photograph before/after from the same vantage, and close out the permit.
What counts as done
- Before photo with a ruler showing the lip height
- Wet cut grinding equipment photo (dust suppression method confirmed)
- After photo showing the ground bevel with the lip reduced to a safe ADA compliant transition
- Lip height measurement confirming the transition is within tolerance after grinding
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788470706901_4msm8ee","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.