intermediate work · the public county-road right of way bordering the refuge and surrounding Llano Estacado farmland, south side, Bailey County, TX 79347
Plant a native buffer strip along the crane feeding-field roadside edge, the public county-road right of way bordering the refuge and surrounding Llano Estacado farmland, stretch 3.
Fund it for $170. Proof lands onchain when it's done.
$170 proposed
Not funded yet. Settles as earned credit, $170 proposed.
- Proof811 locate confirm plus before after photos plus species record plus GPS
- Open until2026-10-04
- Levelintermediate
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
Not for you? Pledge backing · free Fund this work · $170
What the work involvesThe survey above found a bare or lawn-only roadside stretch bordering the refuge and nearby farmland, and a native buffer strip stabilizes the road margin and supports the habitat corridor wintering cranes use between the refuge and their day-feeding fields.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Photograph the bare or lawn-only roadside stretch before starting, from the same vantage used in the survey.
- 2. Confirm no buried utility line with an 811 locate before digging.
- 3. Hand dig planting holes for a native buffer strip (native grass/forb mix suited to the Llano Estacado) along the public road right of way, staying off the adjacent farmland.
- 4. Set the plants at grade, backfill, and water in, hand tools only, then photograph the finished buffer strip.
What counts as done
- 811 locate reference before digging
- Before photo of the bare or lawn-only roadside stretch
- Native species recorded
- Confirmation the entire survey or work stayed on the refuge's designated public overlook, the auto-tour route, or a public road; that no playa lake bed was walked onto; that no crane roost or feeding flock was approached, called to, played back to, droned, or flash-photographed; and that no water or sediment sample was collected from a saline playa lake.
- After photo of the planted, watered-in buffer strip
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788482076987_0ksz671","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.