intermediate work · a public-road irrigation delivery canal crossing near El Campo, Wharton County, TX 77437
Clear debris from an irrigation canal turnout, irrigation canal crossing near El Campo, site 2.
Fund it for $145. Proof lands onchain when it's done.
$145 proposed
Not funded yet. Settles as earned credit, $145 proposed.
- Proofbefore after photos from the bank plus debris volume record plus flow confirm plus GPS
- Open until2026-10-04
- Levelintermediate
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
Not for you? Pledge backing · free Fund this work · $145
What the work involvesThe survey above found debris or a vegetation jam on the bank-accessible face of a canal or turnout structure at the irrigation canal crossing near El Campo, and clearing it from the bank keeps the delivery network's public-road-facing structures functioning without ever entering the water.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Photograph the debris-blocked structure before starting, from the same bank vantage used in the survey.
- 2. Using hand tools, clear debris from the bank-accessible face of the structure only, never entering the water or the canal channel. No water or sediment from the canal, turnout, or field tailwater is contacted or sampled at any level; this work stays on the canal bank, the road shoulder, or the upland margin only.
- 3. Confirm the cleared structure allows visible flow across its bank-accessible face.
- 4. Photograph the cleared structure and record the debris type and approximate volume removed.
What counts as done
- Before photo of the debris-blocked structure from the bank
- Debris type and approximate volume removed recorded
- Confirmation the entire survey or work stayed on the public road right of way, the county road shoulder, a public park or building, or the resident's own property with consent; that no flooded rice field was entered and no levee was walked on private land; that no standing water was worked in; and that no water or sediment sample was collected from an irrigation canal, turnout, or field tailwater at any level.
- After photo of the cleared structure with visible flow across its bank-accessible face
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788482155288_fmxtkw1","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.