intermediate work · the public streets and grounds around Rio Hondo City Hall, 121 N. Arroyo Blvd, Rio Hondo, TX 78583

Stencil a storm drain inlet, site 1, the public streets and grounds around Rio Hondo City Hall, 121 N. Arroyo Blvd, Rio Hondo, TX 78583.

Fund it for $130. Proof lands onchain when it's done.

$130 proposed

Not funded yet. Settles as earned credit, $130 proposed.

Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.

Not for you? Pledge backing · free Fund this work · $130

What the work involves

A storm drain inlet near Rio Hondo City Hall carries no dumping-warning stencil, leaving residents with no reminder that this drain empties untreated toward the Arroyo Colorado watershed.

Where
the public streets and grounds around Rio Hondo City Hall, 121 N. Arroyo Blvd, Rio Hondo, TX 78583 · Open the map
Pay
$130 proposed

This packet is not funded yet, so this figure is a proposed price and not money waiting in escrow. If a buyer funds it, approved proof settles that price onchain. If nobody funds it, approved proof earns provable credit toward the work instead of cash — recorded, and readable any time at vealth.net/labor/credit/(your wallet). You see which before you claim, never after.

Proof
before after photos plus stencil legibility confirm plus GPS

This is exactly what gets it approved. Nothing settles without it.

Level
intermediate
Open until
2026-10-04
Posted by
0x034F…6c89

The creator wallet. Its signature is what approves proof and settles the wage.

How this work is done

A documented method, so this packet comes out the same whoever does it.

Steps

  1. 1. Locate the storm drain inlet and photograph its current unmarked condition.
  2. 2. Clean the surface area around the inlet for stencil adhesion.
  3. 3. Apply the 'no dumping, drains to creek' stencil using the approved template and low-VOC marking paint.
  4. 4. Photograph the finished, legible stencil.

What counts as done

  • Before photo of the unmarked inlet
  • Low-VOC marking paint product confirmed
  • After photo of the legible, finished stencil

Proof is measured against these, not judged by taste.

The standard this serves

Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.

The money and the proof

What is promised, and what is not.

Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788500801662_94jrqz9","funderWallet":"0xYOU"}.

An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.

Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.

Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.