intermediate work · the public day-use area near Park Headquarters, Guadalupe River State Park, 3350 Park Rd 31, Spring Branch, TX 78070
Remove invasive plants from the creek bank-top margin, Guadalupe River State Park's public day-use area, site 3.
Fund it for $195. Proof lands onchain when it's done.
$195 proposed
Not funded yet. Settles as earned credit, $195 proposed.
- Proofpark staff approval confirm plus before after photos plus bag removal confirm plus GPS
- Open until2026-10-05
- Levelintermediate
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
Not for you? Pledge backing · free Fund this work · $195
What the work involvesThe survey above found invasive plant material crowding the bank-top margin near Guadalupe River State Park's public day-use area; hand removal from the bank top only, staying off the travertine and out of the water, restores native bank cover without disturbing the fragile creek community.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Photograph the invasive-plant-crowded bank margin before starting, from the same public vantage used in the survey.
- 2. Confirm with park staff that the removal location is approved and is on the park's public accessible ground, staying at least an arm's length back from the creek or spring edge. This work never enters the creek or spring, never wades or steps into the water, never walks the creek bed, and never touches or disturbs the travertine formations or moss at any skill level.
- 3. Hand pull or hand cut the invasive plant material at the bank-top margin only, never stepping into the water or onto travertine, and never touching moss. This work never enters the creek or spring, never wades or steps into the water, never walks the creek bed, and never touches or disturbs the travertine formations or moss at any skill level.
- 4. Bag and remove the pulled material, and photograph the cleared bank-top margin.
What counts as done
- Before photo of the invasive-crowded bank margin
- Park staff approval of the removal location recorded
- Confirmation that this job never entered Honey Creek State Natural Area outside a scheduled public guided tour; that it never entered the creek or spring, never touched or disturbed travertine or moss, and never collected any plant, animal, mineral, or water sample from the creek, spring, or river; that any river-adjacent work stayed bank-top only with the current weather and flash-flood forecast checked before starting; and that sturdy footwear, sun protection, and adequate water were carried given Hill Country heat and steep limestone footing.
- Bagged material removed from site confirmed
- After photo of the cleared bank-top margin
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788568385988_y3jla7p","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.