intermediate work · the public river trail near the Guadalupe River day-use area, downstream of the Honey Creek confluence, Guadalupe River State Park, 3350 Park Rd 31, Spring Branch, TX 78070
Install trail erosion control above the spring-to-creek transition, Guadalupe River State Park's public river trail, site 3.
Fund it for $200. Proof lands onchain when it's done.
$200 proposed
Not funded yet. Settles as earned credit, $200 proposed.
- Proofpark staff approval confirm plus before after photos plus stabilization confirm plus GPS
- Open until2026-10-05
- Levelintermediate
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
Not for you? Pledge backing · free Fund this work · $200
What the work involvesThe survey above found an eroded trail stretch near Guadalupe River State Park's public river trail draining toward the karst spring-to-creek transition; a water bar or erosion-control matting installed on the park's public trail system directs runoff away before it reaches the spring or creek.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Steps
- 1. Photograph the eroded trail stretch before starting, from the same public vantage used in the survey.
- 2. Confirm with park staff that the location is approved for erosion-control work on the park's public trail system. This work happens only during a scheduled Friends of Guadalupe River State Park and Honey Creek guided walk (registration required, no pets); Honey Creek State Natural Area is never entered outside a scheduled public guided tour, at any skill level.
- 3. Install a water bar or erosion-control matting across the trail-tread channel by hand, directing runoff off the trail before it can reach the spring or creek, hand tools only.
- 4. Photograph the finished installation and confirm the channel is stabilized.
What counts as done
- Before photo of the eroded trail-tread channel
- Park staff approval of the erosion-control location recorded
- Confirmation that this job never entered Honey Creek State Natural Area outside a scheduled public guided tour; that it never entered the creek or spring, never touched or disturbed travertine or moss, and never collected any plant, animal, mineral, or water sample from the creek, spring, or river; that any river-adjacent work stayed bank-top only with the current weather and flash-flood forecast checked before starting; and that sturdy footwear, sun protection, and adequate water were carried given Hill Country heat and steep limestone footing.
- After photo of the installed water bar or matting with the channel stabilized
Proof is measured against these, not judged by taste.
The standard this serves
Green Stormwater Infrastructure. Green stormwater infrastructure is the city's way of handling rain the way a meadow does: rain gardens, planted swales, and permeable pavement that let a storm soak in instead of surging down a pipe. The EPA's inspection standard keeps these systems honest, because a neglected rain garden quietly stops working while still looking like a garden. Mastery is the inspector's eye: reading inlets, overflow, plants, and soil in a single practiced pass. This packet is one such inspection, one basin checked and one record filed, which is precisely how a thousand basins stay alive.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788568503437_bc96our","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.