advanced work · storm-drain trench excavation, Sacramento, CA
OSHA Subpart P trench & excavation pre-entry survey, storm-drain trench excavation (Sacramento).
Fund it for $540. Proof lands onchain when it's done.
$540 proposed
Not funded yet. Settles as earned credit, $540 proposed.
- Proofphoto per checklist section from the surface + GPS + Subpart P checklist + depth/setback/egress measurements + tiered findings routed to the competent person
- Open until2026-10-05
- Leveladvanced
Open, but not claimable yet. restricted: regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
Not for you? Pledge backing · free Fund this work · $540
What the work involvesA storm-drain trench excavation deeper than 5 ft on a Sacramento, CA jobsite has no documented protective system, soil classification, or spoil-pile setback measurement against OSHA Subpart P, the leading cause of trenching fatalities.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- hard hat + safety glasses + hi-vis vest + steel-toe boots (site PPE)
- tablet/clipboard with the OSHA 1926 Subpart P pre-entry checklist
- camera
- tape measure / measuring wheel (surface measurements of depth, setback, egress distance)
- flashlight
- cordoning / stand-back reference (traffic cones or existing barricade to keep clear of the edge)
Steps
- 1. Check in with the site's competent person; confirm scope, don site PPE, and confirm you observe-and-document from the surface only, you never enter the excavation, never classify soil for the excavation, and never authorize entry (Subpart P reserves these for the competent person).
- 2. Measure and photograph the excavation depth and the protective-system method in use, sloping/benching, or a shoring system / trench shield (box), and record whether a protective system is present for any excavation 5 ft or deeper that is not entirely in stable rock (§1926.652).
- 3. Document soil-classification evidence: confirm a competent-person soil classification (Type A/B/C) exists to justify the protective system chosen; photograph and measure the spoil-pile setback from the edge (must be ≥2 ft) (Appendix A / §1926.651(j)).
- 4. Check access/egress: a ladder, ramp, or stair within 25 ft of lateral travel for any trench 4 ft or deeper; photograph and measure the travel distance (§1926.651(c)).
- 5. Screen surface hazards: adjacent equipment/traffic loads near the edge, exposed underground utilities, standing water in the excavation, undermined adjacent structures, and any atmospheric-hazard trigger (>4 ft in a possible hazardous atmosphere); record whether the competent person's atmospheric test log is present (§1926.651(g)).
- 6. For each finding, mark the condition against the Subpart P checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible competent person.
- 7. Enter photos, GPS/address, the checklist, surface measurements, and the tiered findings list; sign. Route stop-work items to the competent person with a timestamp, never enter or authorize entry.
What counts as done
- Photos from the surface of excavation depth, the protective-system method (sloping/benching/shoring/shield), spoil-pile setback, and access/egress
- GPS / address confirm
- OSHA Subpart P checklist with measured depth, spoil-pile setback (≥2 ft), and egress distance (≤25 ft for trenches 4 ft or deeper)
- Presence/absence of a competent-person soil classification (Type A/B/C) and, where triggered, the atmospheric test log
- Tiered findings list (stop-work / correct-before-proceed / monitor) with the competent person named + timestamp of stop-work items routed
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788570560287_mw9wevj","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.