advanced work · mobile-crane precast lift, San Diego, CA
OSHA Subpart CC crane & rigging pre-lift spotter survey, mobile-crane precast lift (San Diego).
Fund it for $540. Proof lands onchain when it's done.
$540 proposed
Not funded yet. Settles as earned credit, $540 proposed.
- Proofphoto from a safe distance per checklist section + GPS + Subpart CC checklist + power-line/outrigger/swing-zone/rigging status + tiered findings routed to the lift director
- Open until2026-10-05
- Leveladvanced
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
Not for you? Pledge backing · free Fund this work · $540
What the work involvesA mobile-crane precast lift on a San Diego, CA site is set up near overhead power lines without documented ground/outrigger, power-line clearance, swing-radius barricading, or rigging condition against OSHA Subpart CC. Power-line contact and crane tip-over are top crane fatalities.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- hard hat + safety glasses + hi-vis vest (site PPE)
- tablet/clipboard with the OSHA Subpart CC pre-lift checklist
- camera with zoom (observe from a safe distance)
- tape measure / measuring wheel (setback and barricade distances from the ground)
- the crane's load chart / lift plan for reference
- flashlight
Steps
- 1. Check in with the lift director / crane operator; confirm scope, don PPE, and confirm you observe-and-document from a safe distance only, you never rig, signal, level, or direct the lift (Subpart CC reserves these for the qualified rigger / signal person / operator).
- 2. Ground & setup: photograph and document firm/drained/level ground, full outrigger/stabilizer extension with pads/cribbing, and the crane's level indication (§§1926.1402/.1404).
- 3. Power-line clearance: identify overhead lines and confirm the planned swing/boom keeps the Table A minimum approach distance (default 20 ft for lines ≤350 kV) or that a documented de-energize / encroachment-prevention plan is in place (§1926.1408).
- 4. Swing radius / crush zone: confirm the area swept by the rotating superstructure (counterweight) is barricaded to keep workers out (§1926.1424).
- 5. Personnel & rigging: confirm a qualified signal person + an agreed signal method, a qualified rigger, the load chart / rated capacity posted, and slings/shackles/hooks (with safety latches) in serviceable condition per the rigger's inspection (§§1926.1419/.1425/.1428).
- 6. For each finding, mark the condition against the Subpart CC checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible lift director / qualified operator.
- 7. Enter photos, GPS/address, the checklist, and the tiered findings; sign. Route stop-work items to the lift director / operator with a timestamp, never direct or signal the lift.
What counts as done
- Ground/outrigger setup photographed (firm/level, full extension, pads/cribbing, level indication)
- Overhead power-line minimum-approach clearance (Table A, default 20 ft ≤350 kV) and swing-radius/crush-zone barricading confirmed and photographed
- Qualified signal person + qualified rigger + posted load chart + serviceable rigging (slings/shackles/hooks with safety latches) documented
- GPS / address confirm
- Tiered findings list (stop-work / correct-before-proceed / monitor) with the lift director / qualified operator named + timestamp of stop-work items routed
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788570599347_izbmebb","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.