Open WORK_1788772571071_32n6bju
advanced work · 6th Street & W Hidalgo Ave corridor, downtown Raymondville, TX 78580 (public right-of-way)
Retrofit missing detectable-warning domes onto a curb ramp on 6th Street, ramp 3, 6th Street & W Hidalgo Ave corridor, downtown Raymondville, TX 78580 (public right-of-way).
Fund it for $210. Proof lands onchain when it's done.
$210 proposed
Not funded yet. Settles as earned credit, $210 proposed.
- Proofbefore/after photos + dome-panel spec sheet + anchor-set photo + GPS
- Open until2026-10-22
- Leveladvanced
Open, but not claimable yet. restricted: permit-required — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
Not for you? Pledge backing · free Fund this work · $210
What the work involvesA curb ramp along downtown Raymondville's 6th Street corridor is structurally sound but was never fitted with the ADA PROWAG-required detectable-warning dome surface, leaving no tactile cue for a visually-impaired pedestrian at the street edge in this Rio Grande Valley county seat.
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- right-of-way permit + cones/barricades + pedestrian detour signage
- smart level / digital inclinometer + tape measure
- concrete tools + detectable warning surface (truncated dome) panel per city standard
- wet-cut saw with water feed (dust control)
Steps
- 1. ASSESS: measure the existing ramp against PROWAG R304 (running slope ≤8.3%, cross-slope ≤2%, landing, flush transition, detectable warning) and photograph each failure; confirm permit + utility locates before cutting.
- 2. Set up cones/barricades and a safe pedestrian detour outside the work zone.
- 3. Remove the failed ramp section with wet-cut dust controls; form and place the corrected ramp geometry per the city standard drawing.
- 4. Set the detectable warning surface (truncated domes) aligned and embedded per spec; finish transitions flush with the gutter.
- 5. VERIFY: re-measure every R304 dimension with the smart level, photograph readings + before/after from matching vantage, water-test the gutter flow line, and close out the permit.
What counts as done
- Before photo of the ramp with no detectable-warning surface
- Spec sheet/photo of the PROWAG-compliant detectable-warning panel used
- Photo of the panel anchored flush and level at the ramp's base
- After photo of the finished, anchored dome surface
Proof is measured against these, not judged by taste.
What is promised, and what is not.
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1788772571071_32n6bju","funderWallet":"0xYOU"}.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.